AG˹ٷ

STOCK TITAN

Indonesia Energy Announces That Operations On The First of Two New Wells To Be Drilled at Kruh Block Have Commenced

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Neutral)
Tags

Indonesia Energy Corporation (NYSE American: INDO) announced during the H.C. Wainwright Global Investment Conference that operations have commenced for the first of two planned wells at its Kruh Block. The company has completed construction of the drilling pad for the K-29 well and delivered drilling pipe to the site.

The development is taking place on IEC's 63,000-acre Kruh Block in Indonesia. The company is currently awaiting government approvals for tender offers related to the drilling rig and other major components before drilling can begin.

Indonesia Energy Corporation (NYSE American: INDO) ha annunciato, durante la H.C. Wainwright Global Investment Conference, l'avvio delle operazioni per il primo dei due pozzi programmati nel suo Blocco Kruh. La società ha completato la costruzione della piattaforma di perforazione per il pozzo K-29 e ha consegnato le tubazioni per la trivellazione al sito.

Lo sviluppo è in corso nel Blocco Kruh di 63.000 acri di IEC in Indonesia. L'azienda è in attesa delle autorizzazioni governative per le offerte di gara relative alla piattaforma di perforazione e ad altri componenti principali prima di poter iniziare la trivellazione.

Indonesia Energy Corporation (NYSE American: INDO) anunció, durante la H.C. Wainwright Global Investment Conference, que han comenzado las operaciones del primero de dos pozos planeados en su Bloque Kruh. La compañía ha finalizado la construcción de la plataforma de perforación para el pozo K-29 y ha entregado las tuberías de perforación en el sitio.

El desarrollo se lleva a cabo en el Bloque Kruh de 63.000 acres de IEC en Indonesia. La empresa está a la espera de las aprobaciones gubernamentales para las licitaciones relacionadas con la torre de perforación y otros componentes principales antes de poder iniciar la perforación.

Indonesia Energy Corporation (NYSE American: INDO)� H.C. Wainwright 글로벌 투자 컨퍼런스에서 자사 크루(Kruh) 블록� 계획� � 개의 시추� � � 번째 시추 작업� 시작되었다고 발표했습니다. 회사� K-29 시추공을 위한 드릴� 패드� 완공했으�, 시추 파이프를 현장� 반입했습니다.

� 개발은 인도네시아에 위치� IEC� 63,000에이� 규모 크루 블록에서 진행되고 있습니다. 회사� 시추 장비 � 기타 주요 구성품과 관련한 공공 입찰� 대� 정부 승인 대� 중이�, 승인� 완료되어� 시추� 개시� � 있습니다.

Indonesia Energy Corporation (NYSE American: INDO) a annoncé lors de la H.C. Wainwright Global Investment Conference le démarrage des opérations pour le premier des deux puits prévus dans son bloc Kruh. La société a achevé la construction de la plateforme de forage pour le puits K-29 et a livré les tubes de forage sur le site.

Le développement se déroule sur le bloc Kruh de 63 000 acres d'IEC en Indonésie. L'entreprise attend actuellement les approbations gouvernementales pour les appels d'offres liés à la plateforme de forage et autres composants majeurs avant de pouvoir commencer le forage.

Indonesia Energy Corporation (NYSE American: INDO) kündigte auf der H.C. Wainwright Global Investment Conference an, dass die Arbeiten für den ersten von zwei geplanten Bohrungen in ihrem Kruh-Block begonnen haben. Das Unternehmen hat die Bauarbeiten für das Bohrpad des Bohrlochs K-29 abgeschlossen und Bohrrohre zur Baustelle geliefert.

Die Entwicklung erfolgt auf dem 63.000 Acre großen Kruh-Block von IEC in Indonesien. Das Unternehmen wartet derzeit auf behördliche Genehmigungen für Ausschreibungen im Zusammenhang mit dem Bohrgerät und anderen wichtigen Komponenten, bevor die Bohrungen beginnen können.

Positive
  • Operations commenced for new well development at 63,000-acre Kruh Block
  • Infrastructure preparation completed with drilling pad construction and pipe delivery
  • Strategic expansion of drilling operations with two new wells planned
Negative
  • Pending government approvals required before actual drilling can begin

Comments Made During Company Presentation at H.C. Wainwright Conference

JAKARTA, INDONESIA AND DANVILLE, CA, Sept. 09, 2025 (GLOBE NEWSWIRE) -- Indonesia Energy Corporation (NYSE American: INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, today announced its President, Frank Ingriselli, during his presentation at the H.C. Wainwright 27th Annual Global Investment Conference on Tuesday, September 9, 2025 at 12:00 p.m. EST confirmed that operations on the first of its planned next two (2) wells at IEC’s Kruh Block have commenced.

A drilling pad for the next well (called the “K-29� well) has been constructed and drilling pipe has been delivered. IEC’s website has been updated with a company presentation and a slide showing photographs of these items:

The entire conference presentation will also be available for replay next week at IEC’s website at:

Mr. Frank Ingriselli, IEC's President, commented "We are excited that we have commenced operations for drilling the first of 2 wells planned on our 63,000-acre Kruh Block with the drilling pad for well K-29 being constructed and pipe delivered. We are now awaiting government approvals to our tender offers for the drilling rig and other large components to commence drilling. We will keep the marketplace updated as we embark on this exciting period for our company. We believe we have world class assets in Indonesia that should contribute to our strategic plan to maximize returns on our investments and grow shareholder value.�

About Indonesia Energy Corporation Limited

Indonesia Energy Corporation Limited (NYSE American: INDO) is a publicly traded energy company engaged in the acquisition and development of strategic, high growth energy projects in Indonesia. IEC’s principal assets are its Kruh Block (63,000 acres) located onshore on the Island of Sumatra in Indonesia and its Citarum Block (195,000 acres) located onshore on the Island of Java in Indonesia. IEC is headquartered in Jakarta, Indonesia and has a representative office in Danville, California. For more information on IEC, please visit .

Cautionary Statement Regarding Forward-Looking Statements and Regulation FD Disclosure

All statements in this press release, the conference presentation described herein, and related statements of Indonesia Energy Corporation Limited (“IEC�) and its representatives and partners that are not based on historical fact are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and the provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the “Acts�). In particular, the words “explore,� “could,� "estimates," “seek,� "believes," "hopes," “understand,� "expects," "intends," “on-track�, "plans," "anticipates," or "may," and similar conditional expressions are intended to identify forward-looking statements within the meaning of the Acts and are subject to the safe harbor created by the Acts. Any statements made during the presentation at the H. C. Wainwright conference and in this news release other than those of historical fact, about an action, event or development, are forward-looking statements. In this press release, forward-looking statements include, without limitation those related to IEC’s development, drilling and exploration plans at its Kruh Block. While management has based any forward-looking statements contained herein on its current expectations, the information on which such expectations were based may change. These forward-looking statements rely on a number of assumptions concerning future events and are subject to a number of significant risks, uncertainties, and other factors, many of which are outside of the IEC's control, that could cause actual results to materially and adversely differ from such statements. Such risks, uncertainties, and other factors include, but are not necessarily limited to, those set forth in the Risk Factors section of the Company’s annual report on Form 20-F for the fiscal year ended December 31, 2024, filed on April 29, 2025, and other filings with the Securities and Exchange Commission (SEC). Copies are of such documents are available on the SEC's website,  and IEC’s website at . IEC undertakes no obligation to update these statements for revisions or changes after the date of this release, except as required by law.

This press release is being made in part to comply with Regulation FD promulgated by the SEC and has been designed to provide broad, non-exclusionary distribution of the information contained herein to the public,

Company Contact:
Frank C. Ingriselli
President, Indonesia Energy Corporation Limited


FAQ

What progress has Indonesia Energy (NYSE: INDO) made on its new Kruh Block wells in September 2025?

Indonesia Energy has commenced operations on the first of two planned wells, with the drilling pad for well K-29 constructed and drilling pipe delivered. The company is awaiting government approvals for drilling rig tenders.

Where is Indonesia Energy (INDO) drilling its new K-29 well?

The K-29 well is being developed on Indonesia Energy's 63,000-acre Kruh Block in Indonesia.

What approvals does Indonesia Energy (INDO) still need for the Kruh Block drilling?

The company is awaiting government approvals for its tender offers related to the drilling rig and other large components before drilling can commence.

How many new wells is Indonesia Energy (NYSE: INDO) planning to drill at Kruh Block?

Indonesia Energy is planning to drill two new wells at the Kruh Block, with operations having commenced on the first well (K-29).
INDONESIA ENERGY CORP LTD

NYSE:INDO

INDO Rankings

INDO Latest News

INDO Latest SEC Filings

INDO Stock Data

41.50M
9.05M
37.66%
1.16%
4.36%
Oil & Gas E&P
Energy
Indonesia
Jakarta