[10-Q] Perpetua Resources Corp. Quarterly Earnings Report
Perpetua Resources Corp. is advancing the Stibnite Gold Project and reported a dramatic strengthening of liquidity and equity following a June 2025 equity offering. Cash and cash equivalents were $425.4 million at June 30, 2025, up from $44.1 million at December 31, 2024. Total assets rose to $518.0 million from $117.6 million and shareholders' equity increased to $509.7 million from $108.9 million, principally reflecting equity proceeds.
Operationally, the company recorded a Q2 2025 net loss of $6.03 million (Q2 2024: $3.67 million) and a six-month net loss of $14.23 million (six months 2024: $6.62 million). Exploration expense remained the largest operating cost at $10.97 million in Q2 and $24.06 million year-to-date. Perpetua submitted a formal application to U.S. EXIM for up to $2.0 billion of project debt financing, is negotiating a $200�$250 million royalty/stream and expects ~$155 million of construction-phase financial assurance from a counterparty. Key federal approvals including the ROD and a Section 404 permit were obtained, while federal and state legal challenges to permits remain pending. Management discloses that substantial doubt remains about completing all contemplated plans within one year absent further financing and approvals.
Perpetua Resources Corp. sta portando avanti lo Stibnite Gold Project e ha registrato un deciso rafforzamento della liquidità e del patrimonio netto dopo un'emissione azionaria di giugno 2025. La liquidità e gli equivalenti di cassa erano pari a $425,4 milioni al 30 giugno 2025, rispetto a $44,1 milioni al 31 dicembre 2024. Le attività totali sono salite a $518,0 milioni da $117,6 milioni e il patrimonio netto degli azionisti è aumentato a $509,7 milioni da $108,9 milioni, principalmente in seguito ai proventi dell'emissione azionaria.
Sul piano operativo la società ha registrato una perdita netta nel 2° trimestre 2025 di $6,03 milioni (2° trim. 2024: $3,67 milioni) e una perdita netta sui sei mesi di $14,23 milioni (sei mesi 2024: $6,62 milioni). Le spese per esplorazione sono rimaste il costo operativo principale, con $10,97 milioni nel 2° trimestre e $24,06 milioni da inizio anno. Perpetua ha presentato una domanda formale all'U.S. EXIM per fino a $2,0 miliardi di finanziamento del debito di progetto, sta negoziando una royalty/stream di $200�$250 milioni e prevede circa $155 milioni di garanzie finanziarie per la fase di costruzione da parte di una controparte. Sono stati ottenuti permessi federali chiave, inclusi il ROD e un permesso ai sensi della Sezione 404, mentre restano pendenti contestazioni giudiziarie federali e statali sui permessi. La direzione segnala che permangono dubbi sostanziali sulla possibilità di completare tutti i piani previsti entro un anno in assenza di ulteriori finanziamenti e approvazioni.
Perpetua Resources Corp. está avanzando en el Stibnite Gold Project y comunicó un notable fortalecimiento de su liquidez y patrimonio tras una oferta de acciones en junio de 2025. El efectivo y equivalentes de efectivo eran de $425,4 millones al 30 de junio de 2025, frente a $44,1 millones al 31 de diciembre de 2024. Los activos totales aumentaron a $518,0 millones desde $117,6 millones y el patrimonio de los accionistas subió a $509,7 millones desde $108,9 millones, principalmente por los ingresos de la emisión de capital.
En lo operativo, la compañía registró una pérdida neta en el 2T 2025 de $6,03 millones (2T 2024: $3,67 millones) y una pérdida neta en seis meses de $14,23 millones (seis meses 2024: $6,62 millones). El gasto en exploración siguió siendo el mayor costo operativo, con $10,97 millones en el 2T y $24,06 millones en lo que va del año. Perpetua presentó una solicitud formal a U.S. EXIM para hasta $2,0 mil millones de financiamiento de deuda del proyecto, está negociando una regalía/stream de $200�$250 millones y espera aproximadamente $155 millones de garantía financiera durante la fase de construcción por parte de una contraparte. Se obtuvieron aprobaciones federales clave, incluido el ROD y un permiso conforme a la Sección 404, aunque siguen pendientes desafíos legales federales y estatales contra los permisos. La dirección declara que existen dudas sustanciales sobre la capacidad de completar todos los planes previstos en el plazo de un año sin obtener financiación y aprobaciones adicionales.
Perpetua Resources Corp.� Stibnite Gold Project� 진전시키� 있으� 2025� 6� 주식 발행 이후 유동성과 자본� 크게 강화되었다고 보고했습니다. 현금 � 현금� 자산은 2025� 6� 30� 기준 $425.4 million으로, 2024� 12� 31일의 $44.1 million에서 증가했습니다. 총자산은 $117.6 million에서 $518.0 million으로, 자본총계� 주로 주식 수익� 반영� $108.9 million에서 $509.7 million으로 증가했습니다.
운영 측면에서� 회사가 2025� 2분기 당기순손� $6.03 million(2024� 2분기: $3.67 million)� 상반� 당기순손� $14.23 million(상반� 2024: $6.62 million)� 기록했습니다. 탐사비가 여전� 가� � 영업비용으로 2분기� $10.97 million, 연초 대� $24.06 million이었습니�. Perpetua� 프로젝트 부� 자금으로 최대 $2.0 billion� 위해 미국 수출입은�(U.S. EXIM)� 정식 신청서를 제출했으�, $200�$250 million 규모� 로열�/스트림을 협상 중이� 건설 단계에서 � $155 million� 금융보증� 상대방으로부� 받을 것으� 예상합니�. ROD � 섹션 404 허가 � 주요 연방 승인들을 받았지�, 해당 허가� 대� 연방 � � 차원� 법적 이의제기� 여전� 진행 중입니다. 경영진은 추가 자금 조달� 승인� 없을 경우 1� 이내� 계획� 모든 사업� 완료� � 있을지� 대� 상당� 의문� 남아 있다� 공개했습니다.
Perpetua Resources Corp. fait progresser le Stibnite Gold Project et a annoncé un renforcement marqué de sa liquidité et de ses capitaux propres suite à une augmentation de capital en juin 2025. Les liquidités et équivalents de trésorerie s'élevaient à $425,4 millions au 30 juin 2025, contre $44,1 millions au 31 décembre 2024. L'actif total est passé à $518,0 millions contre $117,6 millions et les capitaux propres se sont accrus à $509,7 millions contre $108,9 millions, principalement en raison des produits de l'augmentation de capital.
Sur le plan opérationnel, la société a enregistré une perte nette au 2e trimestre 2025 de $6,03 millions (2T 2024 : $3,67 millions) et une perte nette sur six mois de $14,23 millions (six mois 2024 : $6,62 millions). Les dépenses d'exploration restent le principal poste de coût opérationnel, avec $10,97 millions au 2e trimestre et $24,06 millions depuis le début de l'année. Perpetua a soumis une demande formelle à U.S. EXIM pour jusqu'à $2,0 milliards de financement par emprunt de projet, négocie une redevance/stream de $200�$250 millions et attend environ $155 millions de garanties financières pour la phase de construction de la part d'une contrepartie. Des approbations fédérales clés, y compris le ROD et un permis au titre de la Section 404, ont été obtenues, tandis que des recours fédéraux et étatiques contre les permis restent en cours. La direction indique qu'il subsiste des doutes importants quant à la capacité de mener à bien tous les projets envisagés dans un délai d'un an sans financements et autorisations supplémentaires.
Perpetua Resources Corp. treibt das Stibnite Gold Project voran und meldete nach einer Kapitalerhöhung im Juni 2025 eine deutliche Stärkung seiner Liquidität und seines Eigenkapitals. Zahlungsmittel und Zahlungsmitteläquivalente beliefen sich zum 30. Juni 2025 auf $425,4 Millionen ü $44,1 Millionen zum 31. Dezember 2024. Die Gesamtaktiva stiegen auf $518,0 Millionen von $117,6 Millionen und das Eigenkapital der Aktionäre erhöhte sich vornehmlich durch Eigenkapitalzuflüsse auf $509,7 Millionen von $108,9 Millionen.
Operativ verzeichnete das Unternehmen einen Nettoverlust im 2. Quartal 2025 von $6,03 Millionen (2Q 2024: $3,67 Millionen) und einen Nettoverlust für die sechs Monate von $14,23 Millionen (sechs Monate 2024: $6,62 Millionen). Die Explorationsaufwendungen blieben mit $10,97 Millionen im 2. Quartal und $24,06 Millionen im Jahresverlauf der größte operative Kostenblock. Perpetua hat einen formellen Antrag bei U.S. EXIM für bis zu $2,0 Milliarden Projekt-Fremdkapital gestellt, verhandelt eine $200�$250 Millionen-Royalty/Stream-Vereinbarung und erwartet etwa $155 Millionen an Finanzsicherheiten für die Bauphase von einer Gegenpartei. Wichtige Bundesgenehmigungen, darunter der ROD und eine Genehmigung nach Abschnitt 404, wurden erteilt, während bundes- und staatliche Rechtsanfechtungen gegen Genehmigungen anhängig sind. Das Management weist darauf hin, dass ohne weitere Finanzierung und Genehmigungen erhebliche Zweifel bestehen, ob alle geplanten Maßnahmen innerhalb eines Jahres abgeschlossen werden können.
- $425.4 million in cash and cash equivalents at June 30, 2025, up from $44.1 million at year-end 2024
- Closed a registered equity offering in June 2025 with gross proceeds of approximately $425 million and additional gross proceeds of approximately $46.8 million on exercise of the underwriter option (July 2025)
- Submitted formal application to U.S. EXIM for potential project debt financing of up to $2.0 billion
- Received key federal approvals including the ROD and the U.S. Army Corps Section 404 permit
- Active government grants supporting project studies and costs with $11.3M grant income YTD (combination of DPA and DOTC amounts shown in statements)
- Management discloses substantial doubt about completing all contemplated plans for a period of one year absent additional financing and approvals
- Ongoing legal challenges seeking to vacate the ROD, FEIS and other approvals and pending state and federal litigation create regulatory and timing risk
- Class action securities lawsuit filed alleging misleading statements about expected capital expenditures (filed March 20, 2025)
- Significant operating cash outflow: $32.23 million net cash used in operating activities for the six months ended June 30, 2025
- Outstanding CWA settlement payable of $3.0 million as of June 30, 2025 and previously recognized $5.0 million settlement expense (Q2 2023)
- Large contingent financial assurance needs (company expects ~$155 million of construction-phase financial assurance to be provided by a counterparty) and $18.8M deposit to Idaho Power for long-lead procurement
Insights
TL;DR: Large equity raise materially improves near-term liquidity but operating cash burn and conditional project financing keep execution risk elevated.
The June 2025 equity issuance and subsequent underwriter option exercise markedly increased liquidity, reflected in cash of $425.4M at quarter-end and total shareholders' equity of $509.7M. This provides runway for early works and long-lead procurement (notably the $18.8M Idaho Power deposit). However, net cash used in operating activities of $32.2M for the six months and significant exploration spend ($24.1M YTD) indicate ongoing cash outflows. The company’s capital plan depends on conditional items: a U.S. EXIM financing application for up to $2.0B, a targeted $200�$250 royalty/stream, and assumed financial assurance coverage of ~$155M. These are material positives if realized, but currently remain contingent.
TL;DR: Permitting progress and initial funding are meaningful, but legal challenges and conditional financing create significant project execution risk.
Perpetua has secured important regulatory milestones including the ROD and Army Corps Section 404 permit and has advanced long-lead procurement. The company’s formal U.S. EXIM application and negotiations for a substantial royalty/stream and financial assurance demonstrate a coherent financing plan. Nonetheless, multiple legal challenges seeking to vacate federal approvals, outstanding settlement and environmental obligations (including a $5M CWA settlement with $3M remaining payable), and management’s disclosure of substantial doubt about completing plans within one year mean that key financing and permitting outcomes are not assured. From a project finance viewpoint, conditionality on governmental approvals and counterparty underwriting are the central execution risks.
Perpetua Resources Corp. sta portando avanti lo Stibnite Gold Project e ha registrato un deciso rafforzamento della liquidità e del patrimonio netto dopo un'emissione azionaria di giugno 2025. La liquidità e gli equivalenti di cassa erano pari a $425,4 milioni al 30 giugno 2025, rispetto a $44,1 milioni al 31 dicembre 2024. Le attività totali sono salite a $518,0 milioni da $117,6 milioni e il patrimonio netto degli azionisti è aumentato a $509,7 milioni da $108,9 milioni, principalmente in seguito ai proventi dell'emissione azionaria.
Sul piano operativo la società ha registrato una perdita netta nel 2° trimestre 2025 di $6,03 milioni (2° trim. 2024: $3,67 milioni) e una perdita netta sui sei mesi di $14,23 milioni (sei mesi 2024: $6,62 milioni). Le spese per esplorazione sono rimaste il costo operativo principale, con $10,97 milioni nel 2° trimestre e $24,06 milioni da inizio anno. Perpetua ha presentato una domanda formale all'U.S. EXIM per fino a $2,0 miliardi di finanziamento del debito di progetto, sta negoziando una royalty/stream di $200�$250 milioni e prevede circa $155 milioni di garanzie finanziarie per la fase di costruzione da parte di una controparte. Sono stati ottenuti permessi federali chiave, inclusi il ROD e un permesso ai sensi della Sezione 404, mentre restano pendenti contestazioni giudiziarie federali e statali sui permessi. La direzione segnala che permangono dubbi sostanziali sulla possibilità di completare tutti i piani previsti entro un anno in assenza di ulteriori finanziamenti e approvazioni.
Perpetua Resources Corp. está avanzando en el Stibnite Gold Project y comunicó un notable fortalecimiento de su liquidez y patrimonio tras una oferta de acciones en junio de 2025. El efectivo y equivalentes de efectivo eran de $425,4 millones al 30 de junio de 2025, frente a $44,1 millones al 31 de diciembre de 2024. Los activos totales aumentaron a $518,0 millones desde $117,6 millones y el patrimonio de los accionistas subió a $509,7 millones desde $108,9 millones, principalmente por los ingresos de la emisión de capital.
En lo operativo, la compañía registró una pérdida neta en el 2T 2025 de $6,03 millones (2T 2024: $3,67 millones) y una pérdida neta en seis meses de $14,23 millones (seis meses 2024: $6,62 millones). El gasto en exploración siguió siendo el mayor costo operativo, con $10,97 millones en el 2T y $24,06 millones en lo que va del año. Perpetua presentó una solicitud formal a U.S. EXIM para hasta $2,0 mil millones de financiamiento de deuda del proyecto, está negociando una regalía/stream de $200�$250 millones y espera aproximadamente $155 millones de garantía financiera durante la fase de construcción por parte de una contraparte. Se obtuvieron aprobaciones federales clave, incluido el ROD y un permiso conforme a la Sección 404, aunque siguen pendientes desafíos legales federales y estatales contra los permisos. La dirección declara que existen dudas sustanciales sobre la capacidad de completar todos los planes previstos en el plazo de un año sin obtener financiación y aprobaciones adicionales.
Perpetua Resources Corp.� Stibnite Gold Project� 진전시키� 있으� 2025� 6� 주식 발행 이후 유동성과 자본� 크게 강화되었다고 보고했습니다. 현금 � 현금� 자산은 2025� 6� 30� 기준 $425.4 million으로, 2024� 12� 31일의 $44.1 million에서 증가했습니다. 총자산은 $117.6 million에서 $518.0 million으로, 자본총계� 주로 주식 수익� 반영� $108.9 million에서 $509.7 million으로 증가했습니다.
운영 측면에서� 회사가 2025� 2분기 당기순손� $6.03 million(2024� 2분기: $3.67 million)� 상반� 당기순손� $14.23 million(상반� 2024: $6.62 million)� 기록했습니다. 탐사비가 여전� 가� � 영업비용으로 2분기� $10.97 million, 연초 대� $24.06 million이었습니�. Perpetua� 프로젝트 부� 자금으로 최대 $2.0 billion� 위해 미국 수출입은�(U.S. EXIM)� 정식 신청서를 제출했으�, $200�$250 million 규모� 로열�/스트림을 협상 중이� 건설 단계에서 � $155 million� 금융보증� 상대방으로부� 받을 것으� 예상합니�. ROD � 섹션 404 허가 � 주요 연방 승인들을 받았지�, 해당 허가� 대� 연방 � � 차원� 법적 이의제기� 여전� 진행 중입니다. 경영진은 추가 자금 조달� 승인� 없을 경우 1� 이내� 계획� 모든 사업� 완료� � 있을지� 대� 상당� 의문� 남아 있다� 공개했습니다.
Perpetua Resources Corp. fait progresser le Stibnite Gold Project et a annoncé un renforcement marqué de sa liquidité et de ses capitaux propres suite à une augmentation de capital en juin 2025. Les liquidités et équivalents de trésorerie s'élevaient à $425,4 millions au 30 juin 2025, contre $44,1 millions au 31 décembre 2024. L'actif total est passé à $518,0 millions contre $117,6 millions et les capitaux propres se sont accrus à $509,7 millions contre $108,9 millions, principalement en raison des produits de l'augmentation de capital.
Sur le plan opérationnel, la société a enregistré une perte nette au 2e trimestre 2025 de $6,03 millions (2T 2024 : $3,67 millions) et une perte nette sur six mois de $14,23 millions (six mois 2024 : $6,62 millions). Les dépenses d'exploration restent le principal poste de coût opérationnel, avec $10,97 millions au 2e trimestre et $24,06 millions depuis le début de l'année. Perpetua a soumis une demande formelle à U.S. EXIM pour jusqu'à $2,0 milliards de financement par emprunt de projet, négocie une redevance/stream de $200�$250 millions et attend environ $155 millions de garanties financières pour la phase de construction de la part d'une contrepartie. Des approbations fédérales clés, y compris le ROD et un permis au titre de la Section 404, ont été obtenues, tandis que des recours fédéraux et étatiques contre les permis restent en cours. La direction indique qu'il subsiste des doutes importants quant à la capacité de mener à bien tous les projets envisagés dans un délai d'un an sans financements et autorisations supplémentaires.
Perpetua Resources Corp. treibt das Stibnite Gold Project voran und meldete nach einer Kapitalerhöhung im Juni 2025 eine deutliche Stärkung seiner Liquidität und seines Eigenkapitals. Zahlungsmittel und Zahlungsmitteläquivalente beliefen sich zum 30. Juni 2025 auf $425,4 Millionen ü $44,1 Millionen zum 31. Dezember 2024. Die Gesamtaktiva stiegen auf $518,0 Millionen von $117,6 Millionen und das Eigenkapital der Aktionäre erhöhte sich vornehmlich durch Eigenkapitalzuflüsse auf $509,7 Millionen von $108,9 Millionen.
Operativ verzeichnete das Unternehmen einen Nettoverlust im 2. Quartal 2025 von $6,03 Millionen (2Q 2024: $3,67 Millionen) und einen Nettoverlust für die sechs Monate von $14,23 Millionen (sechs Monate 2024: $6,62 Millionen). Die Explorationsaufwendungen blieben mit $10,97 Millionen im 2. Quartal und $24,06 Millionen im Jahresverlauf der größte operative Kostenblock. Perpetua hat einen formellen Antrag bei U.S. EXIM für bis zu $2,0 Milliarden Projekt-Fremdkapital gestellt, verhandelt eine $200�$250 Millionen-Royalty/Stream-Vereinbarung und erwartet etwa $155 Millionen an Finanzsicherheiten für die Bauphase von einer Gegenpartei. Wichtige Bundesgenehmigungen, darunter der ROD und eine Genehmigung nach Abschnitt 404, wurden erteilt, während bundes- und staatliche Rechtsanfechtungen gegen Genehmigungen anhängig sind. Das Management weist darauf hin, dass ohne weitere Finanzierung und Genehmigungen erhebliche Zweifel bestehen, ob alle geplanten Maßnahmen innerhalb eines Jahres abgeschlossen werden können.
Table of Contents
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
FORM
(Mark One)
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the quarterly period ended
OR
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to
Commission File Number:
(Exact Name of Registrant as Specified in its Charter)
British Columbia, (State or other jurisdiction of incorporation or organization) |
| (I.R.S. Employer Identification No.) |
| | |
(Address of principal executive offices) | | (Zip Code) |
(
(Registrant’s telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Securities Exchange Act of 1934:
| | |||
Title of each class |
| Trading |
| Name of each exchange on which registered |
| |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, an emerging growth company, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
| |||||||
Large accelerated filer |
| ☐ |
| Accelerated filer |
| ☐ | |
| ☒ | | | Smaller reporting company |
| ||
Emerging growth company |
| | | |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes
As of August 1, 2025, the registrant had
Table of Contents
PERPETUA RESOURCES CORP.
TABLE OF CONTENTS
|
| Page | |
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS | | 2 | |
| | | |
PART I. | FINANCIAL INFORMATION | | |
Item 1. | Condensed Consolidated Financial Statements (Unaudited) | | 4 |
Item 2. | Management’s Discussion and Analysis of Financial Condition and Results of Operations | | 19 |
Item 3. | Quantitative and Qualitative Disclosures About Market Risk | | 26 |
Item 4. | Controls and Procedures | | 26 |
| | | |
PART II. | OTHER INFORMATION | | |
Item 1. | Legal Proceedings | | 27 |
Item 1A. | Risk Factors | | 28 |
Item 2. | Unregistered Sales of Equity Securities and Use of Proceeds | | 34 |
Item 3. | Defaults Upon Senior Securities | | 34 |
Item 4. | Mine Safety Disclosures | | 34 |
Item 5. | Other Information | | 34 |
Item 6. | Exhibits | | 35 |
1
Table of Contents
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
Certain statements contained in this Quarterly Report are “forward-looking statements” within the meaning of “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995 and Section 21E of the Securities Exchange Act of 1934 (the “Exchange Act”) and “forward-looking information” within the meaning of applicable Canadian securities laws. All statements, other than statements of historical fact included in this Quarterly Report, regarding our strategy, future operations, financial position, estimated revenues and losses, projected costs, prospects, plans and objectives of management are forward-looking statements. When used in this Quarterly Report, the words “anticipate,” “believe,” “expect,” “estimate,” “forecast,” “intend,” “likely,” “plan,” “potential,” “project,” “outlook,” “may,” “will,” “should,” “would,” “could,” “can,” the negatives thereof, variations thereon and other similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain such identifying words. Forward-looking statements are based on certain estimates, beliefs, expectations and assumptions made in light of management’s experience and perception of historical trends, current conditions and expected future developments, as well as other factors that may be appropriate.
Forward-looking statements necessarily involve unknown risks and uncertainties, which could cause actual results or outcomes to differ materially from those expressed or implied in such statements. Due to the risks, uncertainties and assumptions inherent in forward-looking information, you should not place undue reliance on forward-looking statements. Factors that could have a material adverse effect on our business, financial condition, results of operations and growth prospects can be found in Item 1A, Risk Factors, Item 2, Management’s Discussion and Analysis of Financial Condition and Results of Operations and elsewhere in this Quarterly Report and in Item 1A, Risk Factors and Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations in our Annual Report on Form 10-K for the year ended December 31, 2024. These factors include, but are not limited to, the following:
● | the Company’s ability to successfully implement and finance the Stibnite Gold Project (the “Project” or “Stibnite Gold Project”) and the occurrence of the expected benefits from the Project, including the creation of jobs and environmental benefits and its ability to achieve the results indicated in the updated cash flow model for the Project released in February 2025 (the “Financial Update”); |
● | the impact of delays in obtaining or failure to obtain required permits and other governmental approvals, the impact of legal challenges by third parties to any such permits or governmental approvals, or the ability of the Company to comply with the terms and requirements of such permits and other governmental approvals on the Company’s business, results of operations and financial condition; |
● | the Company’s ability to satisfy financial assurance requirements under applicable federal and state law on acceptable terms and on anticipated timelines, if at all; |
● | the Company’s ability to successfully secure financing from the Export-Import Bank of the United States (“U.S. EXIM”) or other sources on acceptable terms, or at all, including the review process and potential outcome of the Company’s U.S. EXIM financing application; the eligibility of the Project for funding under the Make More in America (“MMIA”) initiative and China and Transformational Exports Program (“CTEP”); and the expected timing of, and benefits to the Project of, securing such financing from U.S. EXIM or other sources; |
● | the Company’s ability to successfully satisfy any conditions to financing sources on expected timelines, if at all; |
● | the Company’s ability, in connection with efforts to satisfy financial assurance requirements applicable to the Project and to provide additional Project financing, to enter into a royalty or stream agreement on acceptable terms and on the anticipated timeline, if at all; |
● | the intended environmental and other outcomes of the South Fork Salmon Water Quality Enhancement Fund (the “Fund”) related to the Nez Perce Tribe’s Clean Water Act (“CWA”) lawsuit, and the outcome of good faith discussions between the Company and the Nez Perce Tribe with respect to future permitting and activities at the Project; |
● | regulatory and legal changes, requirements for additional capital, requirements for additional water rights and the potential effect of proposed notices of environmental conditions relating to mineral claims; |
● | the accuracy of analyses and other information based on expectations of future performance and planned work programs; |
● | possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; |
● | assumptions and analysis underlying our mineral reserve estimates and plans for mineral resource exploration and development; |
● | the Company’s history of losses and expectation of future losses; |
● | the Company’s limited property portfolio and potential challenges related to the Company’s title to its mineral properties; |
● | timing, costs and potential success of future activities on the Company’s properties, including, but not limited to, development and operating costs in the event that a construction decision is made and the Company’s ability to achieve production at the Project if constructed; |
● | potential results of exploration, development and environmental protection and remediation activities; |
2
Table of Contents
● | current or future litigation or environmental liability, including litigation challenging the validity of the permits and approvals issued with respect to the Project; |
● | global economic, political and social conditions and financial markets, including any potential regulatory or policy changes, the imposition or increase in tariffs, changes in existing trade agreements and relations, inflationary pressures and elevated interest rates; |
● | changes in gold and antimony commodity prices; |
● | our ability to implement our strategic plan and to maintain and manage growth effectively; |
● | our reliance on outside consultants for critical services; |
● | risks related to our largest shareholder; |
● | loss of key executives or the inability to hire or retain key executives or employees to support construction, permitting and operational activities; |
● | high levels of competition within the mining industry; |
● | equipment, labor and services required for exploration and development of the Project; |
● | labor shortages and disruptions; |
● | cyber-attacks and other security breaches of our information and technology systems; and |
● | other factors and risks described under the heading “Risk Factors” in Item 1A of this Quarterly Report. |
Statements concerning mineral resource and mineral reserve estimates may also be deemed to constitute forward-looking information to the extent that such statements involve estimates of the mineralization that may be encountered if a property is developed.
With respect to forward-looking information contained herein, the Company has applied several material factors or assumptions including, but not limited to, assumptions that the U.S. Forest Service will issue a Notice to Proceed for construction of the Project in a timely manner and as expected; the remaining state permits will be reviewed, issued in a timely manner and as expected; that the Company will be able to satisfy all conditions provided in various federal and state permits that must be met to commence construction; that the U.S. EXIM application will be reviewed and approved within the expected timeframe at the amount equal to or higher than the amount indicated in the related letter of intent; that the Company will be able to satisfy the conditions to obtain a funding commitment from U.S. EXIM and to receive committed funds when needed; the ongoing royalty financing negotiations will proceed in a timely manner and result in a binding agreement on the terms anticipated; that the Company will be able to satisfy financial assurance requirements applicable under applicable federal and state law; that the Company’s proposed financing package will be sufficient to finance permitting, pre-construction and construction of the Project or that the company will be able to secure alternate financing if necessary; certain assumptions as to production rates, operating costs, recovery and metal costs; that no pending or future litigation will result in material delay to the Project schedule or a material increase to Project costs; that the current exploration, development, environmental and other objectives concerning the Project can be achieved and that the Company’s other corporate activities will proceed as expected; that all requisite information will be available in a timely manner; that the current price and demand for gold, antimony and other metals will be sustained or will improve; that general business and economic conditions will not change in a materially adverse manner and that all necessary governmental approvals for the planned exploration, development and environmental protection activities on the Project will be obtained in a timely manner and on acceptable terms, and that the Company or such agencies will be able to successfully defend against any challenges to such governmental approvals; and that the continuity of economic and political conditions and operations of the Company will be sustained.
These risks are not exhaustive. Because of these risks and other uncertainties, our actual results, performance or achievement, or industry results, may be materially different from the anticipated or estimated results discussed in the forward-looking statements in this Quarterly Report. New risk factors emerge from time to time, and it is not possible for our management to predict all risk factors nor can we assess the effects of all factors on our business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained in, or implied by, any forward-looking statements. Our past results of operations are not necessarily indicative of our future results. You should not rely on any forward-looking statements, which represent our beliefs, assumptions and estimates only as of the dates on which they were made, as predictions of future events. We undertake no obligation to update these forward-looking statements, even though circumstances may change in the future, except as required under applicable securities laws. We qualify all of our forward-looking statements by these cautionary statements.
3
Table of Contents
PART I - FINANCIAL INFORMATION
Item 1. Financial Statements.
Perpetua Resources Corp.
CONDENSED CONSOLIDATED BALANCE SHEETS (Unaudited)
| | | | | | |
| | June 30, | | December 31, | ||
|
| 2025 |
| 2024 | ||
ASSETS |
| |
|
| |
|
CURRENT ASSETS |
| |
|
| |
|
Cash and cash equivalents | | $ | | | $ | |
Receivables (Note 7) | |
| | |
| |
Prepaids | |
| | |
| |
Deposits (Note 6) | | | | | | — |
| |
| | |
| |
NON-CURRENT ASSETS | |
| | |
|
|
Buildings and equipment, net | |
| | |
| |
Right-of-use assets | |
| | |
| |
Environmental reclamation bond | | | | | | |
Mineral properties and interest (Note 3) | |
| | |
| |
TOTAL ASSETS | | $ | | | $ | |
| | | | | | |
LIABILITIES AND SHAREHOLDERS’ EQUITY | |
|
| |
|
|
CURRENT LIABILITIES | |
|
| |
|
|
Trade and other payables | | $ | | | $ | |
Lease liabilities | |
| | |
| |
CWA settlement payable (Note 6) | | | | | | |
| |
| | |
| |
NON-CURRENT LIABILITIES | |
|
| |
|
|
CWA settlement payable (Note 6) | |
| | |
| |
TOTAL LIABILITIES | | | | | | |
| | | | | | |
COMMITMENT AND CONTINGENCIES (Note 6) | |
|
| |
|
|
| | | | | | |
SHAREHOLDERS’ EQUITY (Note 4) | |
|
| |
|
|
Common shares, without par value, unlimited shares authorized, | |
| | |
| |
Additional capital | | | | | | |
Accumulated deficit | |
| ( | |
| ( |
TOTAL SHAREHOLDERS’ EQUITY | | | | | | |
| | | | | | |
TOTAL LIABILITIES AND SHAREHOLDERS’ EQUITY | | $ | | | $ | |
See accompanying notes to the unaudited condensed consolidated financial statements.
4
Table of Contents
Perpetua Resources Corp.
CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS (Unaudited)
| | | | | | | | | | | | |
| | For the three months ended June 30, | | For the six months ended June 30, | ||||||||
|
| 2025 |
| 2024 |
| 2025 |
| 2024 | ||||
EXPENSES |
| |
|
| |
| | |
|
| |
|
Corporate salaries and benefits | | $ | ( | | $ | | | $ | | | $ | |
Depreciation | |
| | |
| | |
| | |
| |
Directors’ fees | |
| | |
| | |
| | |
| |
Exploration | | | | | | | | | | | | |
Environmental liability expense | | | — | | | | | | — | | | |
General and administration | |
| | | | | | | | | | |
Professional fees | |
| | | | | | | | | | |
Shareholder and regulatory | | | | | | | | | | | | |
OPERATING LOSS | |
| | |
| | |
| | |
| |
| | | | | | | | | | | | |
OTHER (INCOME) EXPENSES | |
|
| |
|
| |
|
| |
|
|
Grant income (Note 7) | |
| ( | |
| ( | |
| ( | |
| ( |
Interest income | |
| ( | |
| ( | |
| ( | |
| ( |
Other (income) expenses | | | ( | | | | | | ( | | | |
Total other (income) expenses | |
| ( | |
| ( | |
| ( | |
| ( |
| | | | | | | | | | | | |
NET LOSS | | $ | | | $ | | | $ | | | $ | |
| | | | | | | | | | | | |
NET LOSS PER SHARE, BASIC AND DILUTED | | $ | | | $ | | | $ | | | $ | |
| | | | | | | | | | | | |
WEIGHTED AVERAGE COMMON SHARES OUTSTANDING, BASIC AND DILUTED | |
| | |
| | |
| | |
| |
See accompanying notes to the unaudited condensed consolidated financial statements.
5
Table of Contents
Perpetua Resources Corp.
CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS’ EQUITY (Unaudited)
For the three and six months ended June 30, 2025 and 2024
| | | | | | | | | | | | | | |
| | Common Shares | | Additional | | Accumulated | | | | |||||
|
| Shares |
| Amount |
| Capital |
| Deficit |
| Total | ||||
BALANCE, December 31, 2023 | | | | $ | | | $ | | | $ | ( | | $ | |
Share-based compensation |
| — | |
| — | | | | |
| — | |
| |
Share units distributed | | | | | | | | ( | | | — | | | — |
Net loss for the period |
| — | |
| — | | | — | |
| ( | |
| ( |
BALANCE, March 31, 2024 |
| | | | | | | | | | ( | | | |
Share-based compensation | | — | | | — | | | | | | — | | | |
Share units distributed | | | | | | | | ( | | | — | | | — |
Exercise of share purchase options | | | | | | | | ( | | | — | | | |
Net loss for the period | | — | | | — | | | — | | | ( | | | ( |
BALANCE, June 30, 2024 | | | | $ | | | $ | | | $ | ( | | $ | |
| | | | | | | | | | | | | | |
BALANCE, December 31, 2024 | | | | $ | | | $ | | | $ | ( | | $ | |
Share-based compensation |
| — | |
| — | | | | |
| — | |
| |
Share units distributed | | | | | | | | ( | | | — | | | — |
Exercise of options | | | | | | | | ( | | | — | | | |
Net loss for the period |
| — | |
| — | | | — | |
| ( | |
| ( |
BALANCE, March 31, 2025 | | | | | | | | | | | ( | | | |
Shares sold through offerings | | | | | | | | — | | | — | | | |
Share issuance costs | | — | | | ( | | | — | | | — | | | ( |
Share-based compensation | | — | | | — | | | | | | — | | | |
Shares units distributed | | | | | | | | ( | | | — | | | — |
Exercise of options | | | | | | | | ( | | | — | | | |
Net loss for the period | | — | | | — | | | — | | | ( | | | ( |
BALANCE, June 30, 2025 |
| | | $ | | | $ | | | $ | ( | | $ | |
See accompanying notes to the unaudited condensed consolidated financial statements.
6
Table of Contents
Perpetua Resources Corp.
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS (Unaudited)
| | | | | | |
| | For the six months ended June 30, | ||||
|
| 2025 |
| 2024 | ||
OPERATING ACTIVITIES: |
| |
|
| |
|
Net loss | | $ | ( | | $ | ( |
Adjustments to reconcile net loss to net cash used in operating activities: | |
| | |
| |
Share-based compensation (Note 4) | |
| | |
| |
Depreciation | |
| | |
| |
Environmental liability expense | | | — | | | |
Unrealized foreign exchange (gain) loss | |
| ( | |
| |
Gain on sale of equipment | | | — | | | ( |
Changes in: | |
| | |
| |
Receivables | |
| | |
| ( |
Prepaids | |
| ( | |
| ( |
Deposits | | | ( | | | — |
Trade and other payables | | | ( | | | ( |
CWA settlement payable | | | — | | | ( |
Environmental reclamation liabilities | | | — | | | ( |
Net cash used in operating activities | |
| ( | | | ( |
| | | | | | |
INVESTING ACTIVITIES: | |
|
| |
|
|
Proceeds from sale of silver royalty | | | — | | | |
Purchase of building and equipment | |
| ( | |
| ( |
Proceeds from sale of equipment | | | — | | | |
Net cash (used in) provided by investing activities | |
| ( | |
| |
| | | | | | |
FINANCING ACTIVITIES: | |
|
| |
|
|
Proceeds from sale of common shares | | | | | | — |
Payment of share issue costs | | | ( | | | — |
Proceeds from exercise of share purchase options (Note 6) | |
| | |
| |
Net cash provided by financing activities | |
| | |
| |
| | | | | | |
Effect of foreign exchange on cash and cash equivalents | |
| | | | ( |
| | | | | | |
Net increase (decrease) in cash and cash equivalents | |
| | | | ( |
Cash and cash equivalents, beginning of period | |
| | | | |
Cash and cash equivalents, end of period | | $ | | | $ | |
| | | | | | |
NON-CASH INVESTING AND FINANCING ACTIVITIES: | | | | | | |
Recognition of operating lease liability and right-of-use asset | | | | | | |
Recognition of share issuance costs in trade and other payables | | | | | | — |
See accompanying notes to the unaudited condensed consolidated financial statements.
7
Table of Contents
Perpetua Resources Corp.
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
1.Nature of Operations and Basis of Presentation
Perpetua Resources Corp. (the “Corporation”, and, together with its Subsidiaries, the “Company”, “Perpetua Resources” or “Perpetua”) was incorporated on February 22, 2011 under the Business Corporation Act of British Columbia. The Corporation was organized to hold shares in wholly owned subsidiaries that locate, acquire, develop and restore mineral properties located principally in the Stibnite – Yellow Pine mining district in Valley County, Idaho, USA. The Corporation’s principal asset is
The unaudited condensed consolidated financial statements are prepared in accordance with accounting principles generally accepted in the United States of America (“GAAP”) and include the accounts of Perpetua Resources Corp. and its wholly owned subsidiaries, Perpetua Resources Idaho, Inc. and Idaho Gold Resource Company, LLC. Intercompany transactions and balances have been eliminated. The unaudited condensed consolidated financial statements do not include all disclosures required of annual consolidated financial statements and, accordingly, should be read in conjunction with our annual financial statements for the year ended December 31, 2024. Certain prior period amounts have been reclassified to be consistent with current period presentation.
In the opinion of the Company, the accompanying unaudited condensed consolidated financial statements contain all adjustments, consisting of only normal recurring adjustments, necessary for a fair statement of the results for the interim periods reported. Operating results for the six months ended June 30, 2025 may not be indicative of results expected for the full year ending December 31, 2025. Management estimates that the Company’s 2025 effective tax rate will be
As of June 30, 2025, Perpetua Resources had cash and cash equivalents totaling approximately $
The Company’s latest liquidity forecast indicates that available cash resources are sufficient to satisfy the Company’s anticipated expenses until the project is full sanction construction-ready, expected in the spring of 2026, and the full Project financing package is formalized. Perpetua expects to generate future profitable operations through the development of the Stibnite Gold Project, which it intends to finance through a comprehensive Project financing package. This financing package is expected to include project financing from U.S. EXIM or other sources, proceeds of the Company’s recent equity offering, and a royalty or streaming arrangement that remains under negotiation. On May 23, 2025, the Company submitted its formal application to U.S. EXIM for potential debt financing of up to $
We believe our Project financing plans will be successful, although there can be no assurance that the Company will successfully complete all of its contemplated plans because these plans are not entirely within our control as of the date hereof. As such, Perpetua continues to explore various strategic and funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; royalty or streaming arrangements; and/or other financing or strategic opportunities. The future receipt of potential funding from these and/or other means cannot be considered certain at this time and, therefore, substantial doubt remains regarding the Company’s ability to successfully complete all of its contemplated plans for a period of one year after the date that these unaudited condensed consolidated financial statements are issued, which could require the Company to delay or defer certain planned activities until such financing is secured.
These unaudited condensed consolidated financial statements have been prepared on a going concern basis, which contemplates the realization of assets and satisfaction of liabilities in the ordinary course of business and do not include any adjustments relating to the recoverability and classification of recorded asset amounts or the amounts and classification of liabilities that might result from the outcome of the uncertainties described above.
8
Table of Contents
Loss per share
Basic loss per share is computed by dividing the net loss by the weighted average number of shares outstanding during the reporting period. Diluted loss per share is computed similar to basic loss per share except that the weighted average shares outstanding are increased to include additional shares for the assumed exercise of share purchase options and vesting and distribution of awarded share units, if dilutive. The Company’s potential dilutive common shares include outstanding share purchase options, restricted share units (“RSUs”), performance share units (“PSUs”), and deferred share units (“DSUs”). Potentially dilutive shares as of June 30, 2025 and 2024, are as follows:
| | | | |
| | June 30, | ||
|
| 2025 |
| 2024 |
Share purchase options | | | | |
Share units (RSU, PSU, DSU) | | | | |
Balance |
| | | |
All potentially dilutive shares were excluded from the calculation of diluted loss per share as their exercise and conversion would be anti-dilutive.
2.Recently Issued Accounting Pronouncements
In December 2023, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Updates (“ASU”) 2023-09, Income Taxes (Topic 740): Improvement to Income Tax Disclosures, amending income tax disclosure requirements for the effective tax rate reconciliation and income taxes paid. The amendments in ASU 2023-09 are effective for fiscal years beginning after December 15, 2024 and are applied prospectively. Early adoption and retrospective application of the amendments are permitted. The Company does not expect the adoption to have a material impact on the consolidated financial statements or disclosures.
In November 2024, the FASB issued ASU 2024-03, Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40): Disaggregation of Income Statement Expenses, which requires disclosure about the types of costs and expenses included in certain expense captions presented on the income statement. The new disclosure requirements are effective for the Company’s annual periods beginning after December 15, 2026, and interim periods beginning after December 15, 2027, with early adoption permitted, and may be applied either prospectively or retrospectively. The Company is currently evaluating the impact of this adoption on our consolidated financial statements and disclosures.
From time to time, new accounting pronouncements are issued by the FASB that are adopted by the Company as of the specified effective date. Unless otherwise discussed, management believes that the impact of recently issued standards did not or will not have a material impact on the Company’s consolidated financial statements upon adoption.
3.Mineral Properties and Interest
The Company’s mineral properties and interest at the Stibnite Gold Project totaled $
The Company’s subsidiaries acquired mineral rights to the Stibnite Gold Project through several transactions. All mineral and surface rights, where applicable, are held by the Company’s subsidiaries through patented and unpatented lode mining claims and mill sites, except the Cinnabar option claims which are held under an option to purchase. All of the Stibnite Gold Project is subject to a
9
Table of Contents
On March 21, 2024, Perpetua Resources and its subsidiaries granted a perpetual
The Company’s obligations under the gold and silver royalty agreements with Franco-Nevada are secured by a continuing security interest and a first priority lien on certain collateral including the land and mineral interests comprising the Project.
Included in mineral properties and interest are annual payments made under option agreements, where the Company is entitled to continue to make annual option payments or, ultimately, purchase certain properties.
As of June 30, 2025, it has not yet been determined that the Project’s mining deposits can be economically and legally extracted or produced because the Project’s estimated reserves do not yet meet the definition of proven reserves under the United States SEC Regulation S-K 1300. Accordingly, development costs related to such reserves will not be capitalized unless they are incurred after such determination. Upon commencement of commercial production, capitalized costs will be amortized over their estimated useful lives or units of production, whichever is a more reliable measure.
Although the Company has taken steps to review and verify mineral rights to the properties in which it has an interest, in accordance with industry standards for properties in the development stage, these procedures do not guarantee the Company’s title and interests. Mineral title may be subject to unregistered prior agreements and noncompliance with regulatory requirements.
4.Shareholders’ Equity
a. | Authorized |
● |
● |
● |
b. | Offerings |
Equity Program: On May 12, 2023, the Corporation entered into the Sales Agreement providing for the sale by the Corporation, from time to time, of its common shares having an aggregate gross offering price of up to $
2025 Offering: On June 11, 2025, the Corporation entered into an underwriting agreement providing for the sale by the Corporation of
10
Table of Contents
c. | Share-based compensation |
Share-based compensation was recognized in the unaudited condensed consolidated statements of operations as follows:
| | | | | | | | | | | | |
| | Three months ended June 30, | | Six months ended June 30, | ||||||||
|
| 2025 |
| 2024 |
| 2025 |
| 2024 | ||||
Exploration | | $ | | | $ | | | $ | | | $ | |
Corporate salaries and benefits | | | ( | | | | |
| | |
| |
Directors’ fees | | | | | | | |
| | |
| |
Total | | $ | | | $ | | | $ | | | $ | |
Share purchase options
The following table summarizes activity for share purchase option activity awarded under the Omnibus Equity Incentive Plan (the “Plan”) that vest over the required service period of the participant:
| | | | | |
| | Number of | | Weighted Average | |
|
| Options |
| Exercise Price (C$) | |
Balance December 31, 2023 |
| | | $ | |
Options exercised |
| ( | |
| |
Options expired |
| ( | |
| |
Balance December 31, 2024 |
| | | $ | |
Options exercised |
| ( | |
| |
Options expired | | ( | | | |
Balance June 30, 2025 |
| | | $ | |
The fair value of options granted is estimated at the time of the grant using the Black-Scholes option pricing model. The risk-free interest rate is based on the government security rate with an equivalent term in effect as of the date of grant. The expected option lives and volatility assumptions are based on historical data of the Company.
During the three and six months ended June 30, 2025, the Company’s total share-based compensation from options was
As of June 30, 2025, share purchase options outstanding and exercisable were
As of June 30, 2025, the intrinsic value of outstanding and exercisable share purchase options is approximately $
11
Table of Contents
Restricted Share Units
The following table summarizes activity for RSUs awarded under the Plan that vest over the required service period of the participant:
| | | | | |
|
|
|
| Weighted Average | |
| | Share | | Grant Date | |
| | Units |
| Fair Value | |
Unvested, December 31, 2023 | | |
| $ | |
Granted | | | |
| |
Distributed (vested) | | ( | |
| |
Cancelled | | ( | |
| |
Unvested, December 31, 2024 | | | | $ | |
Granted | | | | | |
Distributed (vested) | | ( | | | |
Cancelled | | ( | | | |
Unvested, June 30, 2025 | | | | $ | |
During the six months ended June 30, 2025, the Company awarded
During the three and six months ended June 30, 2025, the Company recognized $
The unvested units as of June 30, 2025 are expected to vest as follows:
| | |
Remainder of 2025 |
| |
2026 | | |
2027 |
| |
2028 | | |
Total |
| |
Pursuant to the terms of the Plan, unvested units will be forfeited by participants upon termination of employment in advance of vesting, with the exception of termination due to retirement if certain criteria are met, termination by the Company without cause and upon death or disability.
Performance Share Units
The following table summarizes activity for PSUs and market-based performance share units (“MPSUs”) awarded under the Plan that vest over the required service period of the participant:
| | | | | |
|
|
|
| Weighted Average | |
| | Share | | Grant Date | |
| | Units | | Fair Value | |
Unvested, December 31, 2023 |
| |
| $ | |
Granted |
| |
|
| |
Distributed |
| ( |
|
| |
Cancelled |
| ( |
|
| |
Unvested, December 31, 2024 |
| |
| $ | |
Granted | | | | | |
Added by performance factor on 2022 MPSUs | | | | | |
Distributed | | ( | | | |
Cancelled | | ( | | | |
Unvested, June 30, 2025 | | | | $ | |
12
Table of Contents
During the three and six months ended June 30, 2025, the Company recognized $
The unvested units as of June 30, 2025 are expected to vest as follows:
| | |
Remainder of 2025 |
| |
2026 |
| |
2027 |
| |
2028 | | |
Total |
| |
Pursuant to the terms of the Plan, unvested units will be forfeited by participants upon termination of employment in advance of vesting, with the exception of termination due to retirement if certain criteria are met, termination by the Company without cause and upon death or disability.
PSUs: These PSUs vest upon completion of the performance period and specific performance conditions set forth for each individual grant for individually defined reporting and operating measurement objectives. The Company determines the factor to be applied to that target number of PSUs, with such percentage based on level of achievement of the performance conditions. Upon the achievement of the conditions, any unvested PSUs become fully vested.
During the six months ended June 30, 2025, the Company awarded
Market-based PSUs: During the six months ended June 30, 2025 and 2024, the Company granted MPSUs where vesting is based on the Company’s cumulative total shareholder return (“TSR”) as compared to the constituents that comprise the VanEck Junior Gold Miners ETF (“GDXJ Index”) a group of similar junior gold mining companies, over a
During the six months ended June 30, 2025, the Company awarded
| | | | | | | |
|
| | 2025 |
| | 2024 | |
Grant date fair value | | $ | | $ | | ||
Risk-free interest rate | | | % | | % | ||
Expected term (in years) | | |
| | | ||
Expected share price volatility | | | % | | % | ||
Expected dividend yield | | |
| | |
The expected volatility utilized is based on the historical volatilities of the Corporation’s common shares and the GDXJ Index in order to model the stock price movements. The volatility used was calculated over the most recent three year period. The risk-free interest rates used are based on the implied yield available on a U.S. Treasury zero-coupon bill with a term equivalent to the Performance Period. The expected dividend yield of
13
Table of Contents
Deferred Share Units
The following table summarizes activity for DSUs awarded under the Plan that vest on the date of grant and settle upon the participant’s separation from service:
| | | | | |
| | | | Weighted Average | |
| | Share | | Grant Date | |
|
| Units |
| Fair Value | |
Outstanding, December 31, 2023 | | | | $ | |
Granted | | | | | |
Outstanding, December 31, 2024 | | | | $ | |
Granted |
| | | | |
Distributed |
| ( | |
| |
Outstanding, June 30, 2025 |
| | | $ | |
Under the Plan, the Company may issue DSUs to non-employee directors. During the three and six months ended June 30, 2025,
5.Environmental Reclamation Liability
On January 15, 2021, the Company agreed to an Administrative Settlement Agreement and Order on Consent (“ASAOC”). The Company has accounted for its obligation under the ASAOC as an environmental reclamation liability. The provision for the liability associated with the terms of the ASAOC is based on cost estimates developed with the use of engineering consultants, independent contractor quotes and the Company’s internal development team. The timing of cash flows is based on the latest schedule for early action items. The estimated environmental reclamation liability may be subject to change based on changes to cost estimates and is adjusted for actual work performed. During the six months ended June 30, 2025, the Company did not perform any work on early action items (June 30, 2024: $
| | | | | | |
| | Six months ended June 30, | ||||
|
| 2025 |
| 2024 | ||
Balance at beginning of period | | $ | | | $ | |
| | — | |
| | |
Work performed on early action items | | | — | |
| ( |
Balance at end of period | | $ | — | | $ | |
| | | | | | |
Current portion | | $ | — | | $ | |
Non-current portion | | | — | | | — |
Balance at end of period | | $ | — | | $ | |
In 2021, the Company provided $
6.Commitments and Contingencies
The Company currently holds mining claims and mill sites for which it has an annual assessment obligation of $
b. | Idaho Power Company Procurement Contract and Deposit |
On February 13, 2025, the Company entered into an agreement with Idaho Power Company (“IPCo”) to begin procurement of long lead equipment required to increase the electrical capacity to the plant. This is an important step to ensure parts are
14
Table of Contents
available for installation under a future construction agreement. Under the terms of the agreement, the Company is responsible for paying all costs incurred by IPCo as they procure new equipment from vendors with an estimated total cost of $
The deposit with IPCo is updated each reporting period to reflect payments made to IPCo and costs incurred by IPCo. Costs incurred are currently charged to exploration in the consolidated statements of operations in accordance with the Company’s accounting policies. Movements in the deposit during the six months ended June 30, 2025 and 2024 are as follows:
| | | | | | |
|
| Six months ended June 30, | ||||
| | 2025 |
| 2024 | ||
Balance at beginning of period | | $ | — | | $ | — |
Additions | |
| | |
| — |
Costs incurred | |
| ( | |
| — |
Balance at end of period | | $ | | | $ | — |
| | | | | | |
Current portion | | $ | | | $ | — |
Non-current portion | |
| — | |
| — |
Balance at end of period | | $ | | | $ | — |
c. | Stibnite Foundation |
Upon formation of the Stibnite Foundation on February 26, 2019, the Company became contractually liable for certain future payments to the Stibnite Foundation based on several triggering events, including receipt of a final Record of Decision (“ROD”) issued by the USFS, receipt of all permits and approvals necessary for commencement of construction, commercial production, and of the final reclamation phase.
During the six months ended June 30, 2025, a cash payment in the amount of $
The Stibnite Foundation will support projects that benefit the communities surrounding the Stibnite Gold Project and was created through the establishment of the Community Agreement between Perpetua Resources Idaho, Inc. and
d. | Option Payments on Other Properties |
The Company is obligated to make option payments on mineral properties in order to maintain an option to purchase these properties. As of June 30, 2025, the option payments due on these properties in 2025 are approximately $
e. | Off Balance Sheet Arrangements |
The Company has
f.Legal Update
The Corporation and its subsidiaries have been parties to an ongoing legal proceeding with the Nez Perce Tribe for claimed violations of the CWA allegedly linked to historical mining activities. In August 2019, the Nez Perce Tribe filed suit against the Company in the U.S. District Court for the District of Idaho. The Company filed an answer generally denying liability and
15
Table of Contents
later, the court allowed the Company to amend and file a third-party complaint against the U.S. Forest Service (“USFS”). The Company also filed a separate CWA citizen suit against the Forest Service alleging that several of the point source discharges, as alleged by the Nez Perce Tribe in its complaint, were occurring on lands owned and controlled by the United States government. Pursuant to the terms of the voluntary ASAOC executed in January 2021 with the U.S. Environmental Protection Agency (“U.S. EPA”) and the United States Department of Agriculture (“USDA”), the Company agreed to dismiss its pending actions against the Forest Service without prejudice.
On August 8, 2023, the Company and the Nez Perce Tribe filed a final Settlement Agreement (the “Settlement Agreement”) to resolve the Tribe’s CWA litigation. The parties jointly asked the court to approve the Settlement Agreement and dismiss the case without prejudice. The Settlement Agreement provides for total payments of $
The voluntary CERCLA ASAOC entered into by the Company, the U.S. EPA, and the USDA required numerous early cleanup actions (referenced as “Phase 1” in the ASAOC) relating to legacy environmental conditions left by other mining companies. The Company began the Phase 1 activities in 2022. As of June 30, 2025, the Company determined it had completed all Phase 1 response actions required by the ASAOC and filed necessary reports (called Removal Action Completion Report (“RACR”) in the ASAOC) with the U.S. EPA and USDA with respect to such completion. Pursuant to the terms of the ASAOC, the Company’s Phase 1 work will not be considered complete until U.S. EPA and USDA have approved the RACR submitted by the Company. As of June 30, 2025, the RACR remains under review by the federal agencies and no further costs were accrued associated with this Phase 1 liability. During the six months ended June 30, 2025, the Company spent $
Following the USFS’ publication of the ROD and FEIS authorizing the mine plan for the Project, claims were filed in the U.S. District Court for the District of Idaho against the USFS and other federal agencies on February 18, 2025 by a number of claimants, including Save the South Fork Salmon and the Idaho Conservation League, alleging violations of NEPA and other federal laws in the regulatory review process. Among other remedies, the claimants seek to vacate the ROD, FEIS, Final Biological Opinions (as defined herein), and other Project approvals and to enjoin any further implementation of the Project. PRII filed a motion with the court to intervene in this lawsuit, which was granted by the district court on April 2, 2025. The district court subsequently entered a scheduling order requiring various procedural and dispositive matters, including any motions for summary judgment, to be filed and briefed before December 2025. This scheduling order, however, is subject to change by the court. The Company believes the federal regulatory process was conducted thoroughly and completely by the relevant federal regulatory agencies. However, there can be no assurance that the permits and Project approvals will be upheld upon judicial review.
The Idaho Board of Environmental Quality (“IBEQ”) on May 27, 2025 released its final order rejecting certain petitioners’ appeal from the hearing officer’s decision in favor of the company and the Idaho Department of Environmental Quality (“IDEQ”) with respect to the air permit to construct (“PTC”) issued to the Company by IDEQ. In May 2025, the petitioners filed a motion for reconsideration asking the IBEQ to reverse its previous decision (issued in May 2024) approving the air compliance boundaries set by IDEQ in the PTC. Under applicable Idaho law, the reconsideration motion could not be filed until after the IBEQ released its final order with respect to the PTC. On June 27, 2025, the IBEQ issued its decision rejecting the reconsideration motion. In July 2025, the same petitioners filed a petition for judicial review in Idaho state court challenging the decisions of the IDEQ to issue the PTC and of the IBEQ in upholding the permit. The Company believes that the IDEQ and IBEQ properly followed Idaho law in issuing the PTC. However, there can be no assurance that the PTC will be upheld upon judicial review.
16
Table of Contents
On March 20, 2025, a putative federal class action lawsuit was filed in the United States District Court for the District of Idaho against the Company and certain of its current officers and directors, on behalf of a proposed class of purchasers of the Company’s common shares during the period from April 17, 2024 to February 13, 2025, inclusive. The claim, captioned Barnes et al. v. Perpetua Resources Corp. et al., Case No. 1:25-cv-00160, alleges that the defendants violated Sections 10(b) and 20(a) of the Exchange Act and Rule 10b-5 promulgated thereunder by making false and/or misleading statements during the period from April 17, 2024 to February 13, 2025 regarding the Company’s expected capital expenditures for the Stibnite Gold Project. The complaint seeks unspecified compensatory damages. The district court has issued a scheduling order in this case requiring various procedural and substantive motions to be filed by the parties prior to the end of 2025. These deadlines can be modified by the court. The Company believes that the claim is without merit and intends to vigorously defend itself. However, in view of the uncertainties inherent in litigation, the Company does not express a judgment as to the outcome of this litigation.
7.Government Grants
The Company has been awarded government grants by the U.S. Department of Defense (“DOD”) as described below. Accounting for these DOD grants does not fall under Accounting Standard Codification 606, Revenue from Contracts with Customers, as the DOD does not meet the definition of a customer under this standard. The DOD grant proceeds, which will be used to reimburse expenses incurred, meet the definition of grants related to expenses as the primary purpose for the payments is to fund research and development on antimony trisulfide and advancement of the Company’s Stibnite Gold Project.
During the three and six months ended June 30, 2025 and 2024, grant income included the following:
| | | | | | | | | | | | |
| | Three months ended June 30, | | Six months ended June 30, | ||||||||
Government Grant |
| 2025 |
| 2024 |
| 2025 |
| 2024 | ||||
DPA | | $ | | | $ | | | $ | | | $ | |
DOTC | |
| | |
| | |
| | |
| |
Total | | $ | | | $ | | | $ | | | $ | |
As of June 30, 2025 and December 31, 2024, grant receivable, which is included in receivables on the consolidated balance sheets, include the following:
| | | | | | |
|
| June 30, |
| December 31, | ||
| | 2025 | | 2024 | ||
DPA | | $ | | | $ | |
DOTC | |
| | |
| |
Total | | $ | | | $ | |
Information regarding each individual grant is as follows:
DPA Grant: On December 16, 2022, the Company entered into an undefinitized Technology Investment Agreement (“TIA”) with the DOD - Air Force Research Laboratory for an award of up to $
DOD Ordnance Technology Consortium (“DOTC”) Grant: On August 18, 2023, the Company was awarded an Ordnance Technology Initiative Agreement (“OTIA”) of up to $
17
Table of Contents
further investigations. Under the OTIA, the Company will be reimbursed for these activities on a cost-plus fixed fee basis over the
8.Segment Reporting
Operating segments are defined as components of an enterprise that engage in activities from which it may earn revenues and incur expenses for which separate operational financial information is available and is regularly evaluated by the Chief Operating Decision Maker (the “CODM”), who is our Chief Executive Officer (“CEO”), for the purpose of allocating an enterprise’s resources and assessing its operating performance. The Company has determined that it operates as a single reportable segment, focused on the exploration of its mineral interests in the state of Idaho, United States. This determination is based on the financial information reviewed by the CODM, which is assessed at a consolidated level.
The CODM is responsible for evaluating performance, allocating resources, and making strategic decisions. The primary measure used to assess the Company’s profitability is consolidated net loss, which is used to compare budgeted versus actual results and informs operating cash flow decisions on a monthly basis. The financial position, results of operations, and cash flows of the Company’s single reportable segment align with the unaudited condensed consolidated financial statements presented herein. The measure of segment assets is reported on the consolidated balance sheet as total assets.
The CEO primarily evaluates the Company’s performance based on consolidated net loss and reviews significant expenses, when applicable, on a consolidated basis, consistent with the presentation in the consolidated statements of operations. While the CEO’s primary focus is on overall consolidated results, he also reviews supplemental information on exploration costs by major category. The following table presents the Company’s exploration costs by major category:
| | | | | | | | | | | | |
|
| For the three months ended June 30, |
| For the six months ended June 30, | ||||||||
| | 2025 |
| 2024 |
| 2025 |
| 2024 | ||||
Consulting and labor cost | | $ | | | $ | | | $ | | | $ | |
Engineering | |
| | |
| | |
| | |
| |
Environmental and reclamation | |
| | |
| | |
| | |
| |
Field operations and drilling support | |
| | |
| | |
| | |
| |
Legal and sustainability | |
| | |
| | |
| | |
| |
Permitting | |
| | |
| | |
| | |
| |
TOTAL EXPLORATION | | $ | | | $ | | | $ | | | $ | |
9.Subsequent Event
As discussed in Note 4b, in connection with the June 2025 equity offering and pursuant to the related Underwriting Agreement, the Corporation granted to the underwriters an option to purchase an additional
18
Table of Contents
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
You should read the following discussion and analysis of our financial condition and results of operations for the three and six months ended June 30, 2025 and 2024 with our unaudited condensed consolidated financial statements and related notes and other financial information appearing in this Quarterly Report. Some of the information contained in this discussion and analysis or set forth elsewhere in this Quarterly Report, including information with respect to our plans and strategy for our business, operations, and product candidates, includes forward-looking statements that involve risks and uncertainties. You should review the sections of this Quarterly Report captioned “Risk Factors” and “Cautionary Note Regarding Forward-Looking Statements” for a discussion of important factors that could cause our actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
Overview
Perpetua Resources (formerly Midas Gold Corp.) was incorporated on February 22, 2011 under the Business Corporations Act (British Columbia) (the “BCBCA”). The Corporation was organized to hold shares in wholly owned subsidiaries that locate, acquire, develop and restore mineral properties located principally in the Stibnite – Yellow Pine mining district in Valley County, Idaho, USA. The Corporation’s principal asset is 100% ownership in subsidiaries that control the Stibnite Gold Project. The Corporation currently operates in one segment: mineral exploration in the United States. The registered and records office of Perpetua Resources is located at Suite 2501-550 Burrard St, Vancouver, BC, V6C 2B5, Canada and the corporate head office is located at Suite 201-405 S 8th St, Boise, ID 83702, USA.
2025 Outlook and Goals
Perpetua Resources’ vision is to provide the United States with a domestic source of the critical mineral antimony, develop one of the largest and highest-grade open pit gold mines in the country and restore an abandoned brownfield site. Perpetua Resources’ focus for 2025 is on the following:
● | Finalize remaining permits for the Project to support early works construction expected to start in the fall of 2025; |
● | Advance remaining funding under the comprehensive project financing plan described in “Financing Update” below; and |
● | Advance detailed engineering, long lead procurement, and execution planning to be full sanction construction-ready in the spring of 2026. |
Second Quarter 2025 Key Highlights
● | Zero lost time incidents or reportable environmental spills. |
● | U.S. Army Corps of Engineers (“USACE” or the “Army Corps”) issued the Section 404 permit for the Project. |
● | Submitted formal application to U.S. EXIM for potential Project debt financing of up to $2.0 billion. |
● | Closed $425 million in gross proceeds from equity financing and subsequently additional gross proceeds of $49 million upon full exercise of an underwriter option, for total aggregate gross proceeds of approximately $474 million. |
● | Announced plan for comprehensive project financing plan for the Project. |
● | Published 2024 Sustainability Report, the Company’s twelfth annual sustainability report. |
● | The IBEQ issued a final order rejecting challenges by certain petitioners to the air permit to construct (“PTC”) issued by the IDEQ for the Project and upholding the permit in all respects. |
Financing Update
In connection with the Company’s $425 million equity offering in June 2025, the Company announced a comprehensive plan to finance construction of the Project which primarily includes the following elements:
● | Equity – $459 million in aggregate net proceeds received upon closing of a registered equity offering and concurrent private placement in June 2025 and exercise of the related option in July; proceeds of the offering are expected to be used to fund early construction costs and long lead items as part of the equity requirements for the U.S. EXIM debt finance application submitted in May 2025, with any additional funds intended to support exploration activities, working capital and general corporate purposes; |
● | U.S. EXIM Debt – Up to $2.0 billion project finance debt facility from U.S. EXIM; the Company’s formal application was submitted in May 2025 and due diligence is ongoing; subject to successful diligence and negotiation, the Company anticipates closing the debt financing in 2026; |
19
Table of Contents
● | Royalty or Streaming Agreement – The Company is targeting net proceeds of $200 million to $250 million in exchange for either a gold NSR royalty not to exceed 3.9% or a gold stream; negotiations are in advanced stages and the proposed royalty or stream and financial assurance arrangement (referenced below) is expected to be formalized in summer 2025; and |
● | Financial Assurance Guarantee – The potential gold royalty or streaming agreement referenced in the preceding bullet is expected to include a guarantee and indemnification by the counterparty of substantially all of the Company’s obligations to providers of reclamation bonds or other financial instruments required to satisfy the Company’s obligations to provide construction-phase financial assurance under various federal and state regulatory approvals. The financial assurance that is the subject of the negotiations with the royalty or streaming company is expected to be approximately $155 million of the approximately $160 million in total construction-phase financial assurance that is anticipated to be required under the regulatory approvals for the Project. |
See additional details in the “Liquidity and Capital Resources” section below. The U.S. EXIM debt financing, royalty or streaming agreement and financial assurance are subject to ongoing due diligence and negotiations. There is no assurance that these agreements will be entered into on the terms, for the amounts or on the timelines anticipated, if at all. See “Item 1A – Risk Factors.”
Construction Readiness and Early Works Activities
The Company is advancing construction readiness activities in parallel with the permitting process. Recent updates include:
● | Hired key subject matter experts to guide overall construction readiness; |
● | Ausenco Engineering USA South Inc. (“Ausenco”) completed basic engineering work with updated capital and operating costs and commenced detailed engineering studies; |
● | Continued power line detailed scoping and engineering with IPCo, who has engaged Kiewit Corporation, and identified and initiated procurement of long-lead items required for power line construction; |
● | Entered into an agreement with IPCo to begin procurement of long lead equipment required to increase the electrical capacity to the plant; the initial payment of $18.8 million was made following execution of the agreement; and |
● | Negotiating key design and execution contracts. |
Subsequent to quarter end, the Board of Directors approved a revised budget for fiscal year 2025 to reflect progress made during the first half of 2025 on permits, financing, and construction readiness activities. This revised budget includes expenditures related to early works construction activities anticipated to commence in the fall of 2025 upon receipt of all necessary permits and approvals. See additional details in the Liquidity and Capital Resources section below.
NEPA Permitting Update
On January 3, 2025, the USFS published the ROD and Final Environmental Impact Statement Errata (the “FEIS”) authorizing the Modified Mine Plan for the Project. Per the requirements of the FEIS and ROD, Perpetua is preparing numerous plans comprising the suite of Environmental Monitoring and Management Plans and will incorporate Project updates as well as required mitigation measures, environmental protection measures, financial assurance, and design features in this additional documentation. This will include preparation of a Final Mine Plan of Operations. Pursuant to the terms of the ROD, the USFS is required to review and approve this additional documentation from Perpetua. On July 31, 2025, Perpetua received notice from the USFS that the Plan of Operations was considered complete.
Following the USFS’ publication of the ROD and FEIS authorizing the mine plan for the Project, claims were filed against the USFS, USDA, and other federal agencies on February 18, 2025 in the United States District Court for the District of Idaho by a number of claimants, including Save the South Fork Salmon, the Idaho Conservation League and other non-governmental organizations, alleging violations of NEPA and other federal laws in the regulatory process. Among other remedies, the claimants seek to vacate the ROD, FEIS, Final Biological Opinions issued by the U.S. Fish and Wildlife Service and the National Marine Fisheries Service on September 6, 2024 and October 7, 2024, respectively (together, the “Final Biological Opinions”) and Project approvals and enjoin any further implementation of the Project. PRII filed a motion to intervene in this lawsuit, which was granted by the district court on April 2, 2025. The district court has issued a scheduling order under which all procedural and dispositive motions are required to be filed by the end of 2025, although these deadlines can be modified by the court. The Company believes the federal permitting process was conducted thoroughly and completely by the relevant federal regulatory agencies. However, there can be no assurance that the ROD, FEIS, and other Project approvals will be upheld upon judicial review.
20
Table of Contents
On May 19, 2025, the USACE issued the CWA Section 404 permit for the Project, which included the Compensatory Mitigation Plan and associated financial assurance. The Army Corps has been a part of the review process as a cooperating agency since the Company began the federal NEPA process and has been formally evaluating the Section 404 permit application since 2023. The Section 404 permit was the last remaining federal permit needed to advance the Project towards a construction decision.
Ancillary Permitting Update
With receipt of all federal permits, the Corporation is focused on advancing the Project towards a full construction decision, including finalizing the remaining state permits and securing project financing. Recent permitting updates include:
● | In May 2024, the IDEQ issued its final CWA Section 401 Water Quality Certification for the Project (the “Certification”). In the second quarter of 2024, certain parties initiated a state administrative challenge to the Certification that will require a contested case hearing on certain issues. In March 2025, IDEQ provided a notice of intent to modify its original Certification. IDEQ released its draft modification for public comment in July 2025. The scheduling order for the contested case proceeding has been vacated in light of the IDEQ’s modification action, and a new hearing date has not yet been set. |
● | IDEQ issued a PTC in 2022 that was followed by certain state administrative challenges. On May 27, 2025, the Idaho Board of Environmental Quality (“IBEQ”) released its final order rejecting certain petitioners’ appeal from the hearing officer’s decision in favor of the company and the IDEQ with respect to the PTC. In May 2025, the petitioners also filed a motion for reconsideration asking the IBEQ to reverse its previous decision (in May 2024) approving the air compliance boundaries set by IDEQ in the PTC, which motion was rejected by IBEQ on June 27, 2025. In July 2025, the same petitioners filed a petition for judicial review in Idaho state court challenging the decisions of the IDEQ to issue the PTC and of the IBEQ in upholding the permit. |
● | On March 31, 2025, the IDEQ issued the final cyanidation permit approving the tailing storage facility and water quality monitoring plan. IDEQ’s review of the remaining portions of the Company’s application for a cyanidation facility permit remain pending. |
● | On March 31, 2025, the Idaho Department of Lands (“IDL”) approved the cyanidation facility permanent closure plan, reclamation plan, and associated financial assurance model estimate. |
● | On January 24, 2025, the Director of the Idaho Department of Water Resources (“IDWR”) issued a final order granting the Company’s application for certain water rights to be used in connection with the Project. |
Previously submitted permit applications are continuing through the administrative review process. These include applications to IDEQ for the Idaho Pollutant Discharge Elimination System (“IPDES”) discharge permits (including an individual wastewater discharge permit), and to IDWR for stream alteration permits. IDEQ released the draft individual IPDES permit and the IDEQ modification to the Clean Water Act 401 certification for public comment in July 2025.
21
Table of Contents
Results of Operations
Three and six months ended June 30, 2025 compared to three and six months ended June 30, 2024
| | | | | | | | | | | | |
|
| For the three months ended June 30, |
| For the six months ended June 30, | ||||||||
| | 2025 |
| 2024 | | 2025 |
| 2024 | ||||
EXPENSES | | |
|
| |
| | |
|
| |
|
Corporate salaries and benefits | | $ | (3,307) | | $ | 579,431 | | $ | 685,878 | | $ | 1,046,178 |
Depreciation | |
| 32,257 | |
| 31,392 | |
| 63,190 | |
| 57,753 |
Directors’ fees | |
| 54,345 | |
| 54,449 | |
| 301,927 | |
| 317,082 |
Exploration | |
| 10,965,537 | |
| 10,509,124 | |
| 24,059,966 | |
| 17,081,584 |
Environmental liability expense | |
| — | |
| 414,197 | |
| — | |
| 567,626 |
General and administration | |
| 141,247 | |
| 121,353 | |
| 281,787 | |
| 263,137 |
Professional fees | |
| 368,472 | |
| 340,449 | |
| 962,136 | |
| 717,828 |
Shareholder and regulatory | |
| 184,231 | |
| 139,323 | |
| 347,402 | |
| 263,865 |
OPERATING LOSS | | | 11,742,782 | | | 12,189,718 | | | 26,702,286 | | | 20,315,053 |
| | | | | | | | | | | | |
OTHER (INCOME) EXPENSES | |
|
| |
|
| |
|
| |
|
|
Grant income | |
| (4,921,179) | |
| (8,475,643) | |
| (11,304,569) | |
| (13,645,381) |
Interest income | |
| (764,024) | |
| (42,821) | |
| (1,141,990) | |
| (59,358) |
Other (income) expenses | | | (31,250) | | | 2,461 | | | (24,795) | | | 7,926 |
Total other (income) expenses | | | (5,716,453) | | | (8,516,003) | | | (12,471,354) | | | (13,696,813) |
| | | | | | | | | | | | |
NET LOSS | | $ | 6,026,329 | | $ | 3,673,715 | | $ | 14,230,932 | | $ | 6,618,240 |
Net Loss
Net loss for the three months ended June 30, 2025 was $6.0 million compared with a net loss of $3.7 million for the three months ended June 30, 2024. This $2.3 million increase compared to the prior year period was primarily attributable to a decrease of $3.6 million in grant income partially offset by a $0.7 million increase in interest income and a $0.6 decrease in corporate salaries and benefits.
Net loss for the six months ended June 30, 2025 was $14.2 million compared with a net loss of $6.6 million for the six months ended June 30, 2024. This $7.6 million increase compared to the prior year period was primarily attributable to a $7.0 million increase in exploration expense and a $2.3 million decrease in grant income, partially offset by a $0.6 million decrease in environmental costs and a $1.1 million increase in interest income.
Corporate Salaries and Benefits
This expense relates to salaries and benefits of the employees not directly involved in the exploration and evaluation of the Stibnite Gold Project, primarily corporate employees. Corporate salaries and benefits expense for the three and six months ended June 30, 2025 was $nil and $0.7 million, respectively, which was lower than the 2024 comparative period primarily due to reversal of share-based compensation upon forfeitures of certain unvested equity awards in connection with employee departures in the amount of $0.4 million during the three months ended June 30, 2025.
Directors’ Fees
Each of the Corporation’s non-executive directors is entitled to annual base fees paid in quarterly installments, with the independent Lead Director, Chairs of Board Committees and Members of Board Committees receiving additional fees commensurate with each role. Directors’ fees are inclusive of cash fees and share-based compensation (deferred share units). Directors’ fees for the three and six months ended June 30, 2025 were $0.1 million and $0.3 million, respectively, which was in line with the 2024 comparative periods.
22
Table of Contents
Exploration
This expense relates to all exploration and evaluation expenditures related to the Stibnite Gold Project, including labor, drilling, field operations, engineering, permitting, environmental, legal and sustainability costs. Exploration expenses during the three and six months ended June 30, 2025 were $11.0 million and $24.1 million, respectively, which was higher than the 2024 comparative period primarily due to a ramp up in construction readiness activities following key permitting milestones in 2024. See additional details in the table below:
| | | | | | | | | | | | |
| | For the three months ended June 30, | | For the six months ended June 30, | ||||||||
|
| 2025 |
| 2024 |
| 2025 |
| 2024 | ||||
Consulting and labor cost | | $ | 2,432,689 | | $ | 1,936,993 | | $ | 5,328,712 | | $ | 3,646,461 |
Engineering | |
| 4,456,112 | |
| 5,405,689 | |
| 9,797,388 | |
| 8,246,488 |
Environmental and reclamation | |
| 103,837 | |
| 68,904 | |
| 281,017 | |
| 170,323 |
Field operations and drilling support | |
| 1,498,894 | |
| 937,863 | |
| 2,882,633 | |
| 1,355,236 |
Legal and sustainability | |
| 420,411 | |
| 327,848 | |
| 925,381 | |
| 585,994 |
Permitting | |
| 2,053,594 | |
| 1,831,827 | |
| 4,844,835 | |
| 3,077,082 |
TOTAL EXPLORATION | | $ | 10,965,537 | | $ | 10,509,124 | | $ | 24,059,966 | | $ | 17,081,584 |
Environmental Liability Expense
This expense relates to the ASAOC signed in January 2021 to voluntarily address environmental conditions at the abandoned mine site. Environmental liability expenses for the three and six months ended June 30, 2025 was $nil, which was lower than the 2024 comparative periods due to the Company’s determination in late 2024 that it had completed all Phase 1 response actions required by the ASAOC. The Company has filed necessary reports with the U.S. EPA and USDA with respect to such completion, and no further costs are accrued for this Phase 1 liability as of June 30, 2025.
General and Administrative
This expense is predominantly related to the cost of insurance policies for the U.S. offices. General and administrative expenses for the three and six months ended June 30, 2025 were $0.1 million and $0.3 million, respectively, which was in line with the 2024 comparative periods.
Professional Fees
This expense relates to the legal, accounting and consulting costs of the Corporation. Professional fees for the three and six months ended June 30, 2025 were $0.4 million and $1.0 million, respectively, compared to $0.3 million and $0.7 million, respectively, for the three and six months ended June 30, 2024. The increase for the six-month period was due to higher total legal fees during the three months ended March 31, 2025.
Shareholder and Regulatory
This expense relates to marketing, licenses and fees, and shareholder communications. Shareholder and regulatory expenses for the three and six months ended June 30, 2025 were $0.2 million and $0.3 million, respectively, which was in line with the 2024 comparative periods.
Grant Income
This income results from funding grants awarded to the Company from the DOD to study the domestic production of military-grade antimony trisulfide and to complete environmental and engineering studies necessary to obtain a FEIS, a ROD, and other ancillary permits to sustain the domestic production of antimony trisulfide capability for defense energetic materials. Grant income for the three and six months ended June 30, 2025 was $4.9 million and $11.3 million, respectively, which was lower than the $8.5 million and $13.6 million, respectively, received in the comparable periods in 2024 due to the DPA funding being exhausted in May 2025.
Interest Income
This income results from interest received on the Company’s cash balances. Interest income for the three and six months ended June 30, 2025 was $0.8 million and $1.1 million, respectively, which was higher than the comparable periods in 2024 due to higher average cash balances.
23
Table of Contents
Liquidity and Capital Resources
Capital resources of Perpetua Resources consist primarily of cash and liquid short-term investments. As of June 30, 2025, Perpetua Resources had cash and cash equivalents totaling approximately $425.4 million, approximately $2.1 million in receivables, $0.7 million in prepaids, $18.8 million in deposits primarily from the Idaho Power deposit on long lead equipment paid in February 2025, and $5.2 million in trade and other payables. An additional $46.8 million in net cash proceeds was received in July 2025 from the sale of common shares pursuant to the exercise of the option granted to the underwriters in connection with the equity offering described below. See additional discussion in “Capital Resources” section below.
The Company’s short-term liquidity needs include costs related to ongoing permitting, engineering, project financing, general corporate, and administrative costs as the Company prepares for a full construction decision for the Project, as well as certain early works construction activities and down payments on long-lead items approved for early investment. Long-term liquidity requirements will require project financing to fund the capital costs to develop the Project, which was estimated to be approximately $2,215 million as of the fourth quarter of 2024 according to the Financial Update, and to fund reclamation financial assurance, debt service and other related costs. See additional discussion in “Liquidity” section below.
Capital Resources
Equity Offering
On June 11, 2025, the Corporation entered into the Underwriting Agreement providing for the sale by the Corporation of 22,728,000 shares of its common shares to the underwriters at a price of $13.20 per share. On June 12, 2025, the offering was upsized to 24,622,000 shares at a price of $13.20 per share. In connection with this offering, the Corporation entered into an agreement with Paulson to purchase common shares in a concurrent private placement of 7,575,757 common shares at the same offering price of $13.20 per share. Aggregate proceeds received from these sales were approximately $411.1 million, which is net of offering costs of approximately $13.9 million. Pursuant to the Underwriting Agreement, the Corporation granted the underwriters an option to purchase up to an additional 3,693,300 shares within 30 days of the offering which the underwriters exercised subsequent to quarter end on July 10, 2025. The sale of the option shares closed on July 14, 2025. Proceeds received from this sale were approximately $46.8 million, which is net of offering costs of approximately $2.0 million. The Corporation intends to designate the proceeds of the offering and the private placement toward equity requirements for the US EXIM debt finance application submitted in May 2025, with any additional funds intended to support exploration activities, working capital and general corporate purposes.
Potential Funding from Royalty or Streaming Agreement
The Company is in advanced discussions with potential partners for a financial assurance guarantee and indemnification as noted below, along with proceeds between $200 million to $250 million, in exchange for either a gold NSR royalty not to exceed 3.9% or a gold stream. A royalty, if any, would be expected to provide for buy back of a portion of the royalty if certain conditions are met. The proposed royalty and financial assurance arrangement is expected to be formalized in summer 2025.
24
Table of Contents
Potential Financial Assurance Guarantee
Based on ongoing discussions with the USFS and other federal and state agencies, the Company anticipates that under various existing and pending regulatory approvals for the Project, the Company will be required to provide total financial assurance, in the form of reclamation bonds or other financial instruments, in the amount of approximately $160 million. The Company is in discussions with surety companies and banks to provide the bonds or other financial instruments to the applicable federal and state agencies to satisfy the total financial assurance requirements under applicable federal and state law. The potential gold royalty or streaming agreement referenced above is expected to include a guarantee and indemnification by the counterparty of approximately $155 million of the Company’s obligations to surety providers in respect of such reclamation bonds or other financial instruments.
Potential Project Debt Funding from U.S. EXIM
On April 8, 2024, the Company announced that it received a non-binding and conditional Letter of Interest from U.S. EXIM for potential debt financing of up to $1.8 billion through U.S. EXIM’s MMIA initiative and CTEP. On May 23, 2025, the Company submitted its formal application to U.S. EXIM for potential debt financing of up to $2.0 billion. Upon receipt of the application, U.S. EXIM commenced the due diligence process to determine if a final commitment may be issued. Any final commitment will be dependent on meeting U.S. EXIM’s underwriting criteria, authorization process, finalization and satisfaction of terms and conditions. If the due diligence process is successful, the Company anticipates closing the debt financing in 2026. Funding is subject to U.S. EXIM’s diligence process, and the amount and timing of such funding from U.S. EXIM, if any, is uncertain and subject to conditions outside the Company’s control.
Department of Defense Funding
The Company has been awarded government grants by the DOD as described in Note 7 to the financial statements. Since December 2022, the Company has received $59.2 million in funding under the TIA under Title III of the DPA. The TIA expired on June 16, 2025, and, other than a receivable of $0.6 million outstanding as of June 30, 2025, no additional funds are available under the program. The Company also has an ongoing contract under an OTIA with the DOD through DOTC for up to $22.4 million. See Note 7 to the financial statements for additional information regarding these grants. The Company continues to evaluate other U.S. government funding opportunities, including programs available through the DOD.
Liquidity
Subsequent to quarter end, the Board of Directors approved a revised budget for fiscal year 2025 to reflect progress made during the first half of 2025 on permits, financing, and construction readiness activities. This revised budget includes expenditures related to early works construction activities anticipated to commence in the fall of 2025 upon receipt of necessary permits and approvals. Including the early works construction activities expected to commence in the fall of 2025, our anticipated expenditures for the full fiscal year 2025 are approximately $240.0 million, which includes expenses incurred through June 30, 2025. These expenditures include an estimated $20.4 million to fund permitting and costs related to entering into financial assurance facilities, $20.5 million for general corporate purposes, project financing and administrative costs, $157.4 million for detailed engineering, design work and down payments on long lead time equipment, and $41.7 million for field operations, site early works, exploration drilling, and environmental monitoring and reporting. These costs are expected to be funded from cash on hand or funds received from a royalty or streaming arrangement, when completed. These costs are subject to change due to cost over-runs, delays in project financing or permitting timelines, litigation, or other unbudgeted events, such as effects of inflation, elevated interest rates and the potential impact of tariffs on U.S. trading partners.
Our long-term liquidity requirements will require project financing to fund the capital costs to develop the Project, which was estimated to be approximately $2,215 million as of the fourth quarter of 2024 according to the Financial Update, and to fund reclamation financial assurance and other costs. As such, our capital expenditures may increase significantly to reflect the commencement of full construction and any such expenditures would be subject to the timing and nature of project financing.
The Company’s latest liquidity forecast indicates that available cash resources are sufficient to satisfy the Company’s anticipated expenses until the project is full sanction construction-ready, expected in the spring of 2026, and the full Project financing package is formalized. Perpetua expects to generate future profitable operations through the development of the Stibnite Gold Project, which it intends to finance through a comprehensive Project financing package. This financing package is expected to include project financing from U.S. EXIM or other sources, proceeds of the Company’s recent equity offering, and a royalty or streaming arrangement.
We believe our Project financing plans will be successful, although there can be no assurance that the Company will successfully complete all of its contemplated plans because these plans are not entirely within our control as of the date hereof. As such,
25
Table of Contents
Perpetua continues to explore various strategic and funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; royalty or streaming arrangements; and/or other financing or strategic opportunities. The future receipt of potential funding from these and/or other means cannot be considered certain at this time and, therefore, substantial doubt remains regarding the Company’s ability to successfully complete all of its contemplated plans for a period of one year after the date that these unaudited condensed consolidated financial statements are issued, which could require the Company to delay or defer certain planned activities until such financing is secured.
These unaudited condensed consolidated financial statements have been prepared on a going concern basis, which contemplates the realization of assets and satisfaction of liabilities in the ordinary course of business and do not include any adjustments relating to the recoverability and classification of recorded asset amounts or the amounts and classification of liabilities that might result from the outcome of the uncertainties described above.
Critical Accounting Estimates
There have been no material changes to our critical accounting estimates subsequent to December 31, 2024. For a discussion of the Company’s critical accounting estimates for the fiscal year ended December 31, 2024, please see our Annual Report on Form 10-K for the year ended December 31, 2024.
Item 3. Quantitative and Qualitative Disclosures About Market Risk.
Not applicable.
Item 4. Controls and Procedures.
Evaluation of Disclosure Controls and Procedures
The Company’s management, with the participation of the Company’s Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of the Company’s disclosure controls and procedures as of June 30, 2025 (the “Evaluation Date”). Based on that evaluation, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective as of the Evaluation Date.
Changes in Internal Control Over Financial Reporting.
As of the Evaluation Date, there were no changes in our internal control over financial reporting that occurred during the quarter ended June 30, 2025 that have materially affected, or that are reasonably likely to materially affect, our internal control over financial reporting.
26
Table of Contents
PART II — OTHER INFORMATION
Item 1. Legal Proceedings.
The Corporation and its subsidiaries have been parties to an ongoing legal proceeding with the Nez Perce Tribe for claimed violations of the CWA allegedly linked to historical mining activities. In August 2019, the Nez Perce Tribe filed suit in the United States District Court for the District of Idaho. The Company filed an answer generally denying liability and later, the court allowed the Company to amend and file a third-party complaint against the USFS. The Company also filed a separate CWA citizen suit against the USFS alleging that several of the point source discharges, as alleged by the Nez Perce Tribe in its complaint, were occurring on lands owned and controlled by the United States government.
Pursuant to the terms of the voluntary ASAOC executed in January 2021 with the U.S. EPA and the USDA, the Company agreed to dismiss its pending actions against the Forest Service without prejudice. On August 8, 2023, the Company and the Nez Perce Tribe filed the Settlement Agreement to resolve the tribe’s CWA litigation. The parties jointly asked the court to approve the Settlement Agreement and dismiss the case without prejudice. The Settlement Agreement provides for total payments of $5.0 million by Perpetua over a four-year period. This includes $4.0 million of contributions by Perpetua to the Fund to be used by the Nez Perce Tribe to support water quality improvement projects in the South Fork Salmon River watershed and $1.0 million of reimbursements to the Nez Perce Tribe for legal expenses. Following a 45-day review period by the United States Justice Department and the U.S. EPA, the U.S. District Court for the District of Idaho approved the Stipulation for Dismissal and entered a Judgment on October 2, 2023, which resulted in the CWA lawsuit being dismissed without prejudice. Under the Settlement Agreement, the Company anticipates that a dismissal with prejudice will be entered after completion of Perpetua’s required payments. All required payments to date have been made timely pursuant to the terms of the Settlement Agreement. As of June 30, 2025, the current portion of the settlement was $1,000,000 with the remaining $2,000,000 classified as long-term.
Certain of the Company’s property interests in the Project site are also subject to existing judicial consent decrees entered into by third parties and various governmental entities. These consent decrees, which impose environmental liability and remediation responsibilities on third parties, apply to certain mining claims and mill sites acquired by Perpetua from those third parties. Under the consent decrees, Perpetua is required to grant access to certain Project site areas by regulatory agencies and allow remediation activities to proceed if necessary and to preserve the integrity of previous response actions. Several of the Company’s patented claims in the Hangar Flats and Yellow Pine properties are also subject to a consent decree which requires Perpetua to cooperate with the U.S. EPA and the USFS to implement appropriate response activities.
Additionally, following the USFS’ publication of the ROD and FEIS authorizing the Modified Mine Plan for the Project, claims were filed against the USFS, the USDA and other federal agencies on February 18, 2025 in the United States District Court for the District of Idaho by a number of claimants, including Save the South Fork Salmon, the Idaho Conservation League and other non-governmental organizations, alleging violations of NEPA and other federal laws in the regulatory process. Among other remedies, the claimants seek to vacate the ROD, FEIS, Final Biological Opinions and Project approvals and enjoin any further implementation of the Project. PRII filed a motion to intervene in this lawsuit, which was granted by the district court on April 2, 2025. The district court has issued a scheduling order under which all procedural and dispositive motions are required to be filed by the end of 2025, although these deadlines can be modified by the court. The Company believes the federal permitting process was conducted thoroughly and completely by the relevant federal regulatory agencies. However, there can be no assurance that the ROD, FEIS, and other Project approvals will be upheld upon judicial review.
On March 20, 2025, a putative federal class action lawsuit was filed in the United States District Court for the District of Idaho against the Company and certain of its current officers and directors, on behalf of a proposed class of purchasers of the Company’s common shares during the period from April 17, 2024 to February 13, 2025, inclusive. The claim, captioned Barnes et al. v. Perpetua Resources Corp. et al., Case No. 1:25-cv-00160, alleges that the defendants violated Sections 10(b) and 20(a) of the Exchange Act and Rule 10b-5 promulgated thereunder by making false and/or misleading statements during the period from April 17, 2024 to February 13, 2025 regarding the Company’s expected capital expenditures for the Stibnite Gold Project. The complaint seeks unspecified compensatory damages. The district court has issued a scheduling order in this case requiring various procedural and substantive motions to be filed by the parties prior to the end of 2025. These deadlines can be modified by the court. The Company believes that the claim is without merit and intends to vigorously defend itself. However, in view of the uncertainties inherent in litigation, the Company does not express a judgment as to the outcome of this litigation.
27
Table of Contents
The IBEQ on May 27, 2025 released its final order rejecting certain petitioners’ appeal from the hearing officer’s decision in favor of the company and the IDEQ with respect to the PTC issued to the Company by IDEQ. In May 2025, the petitioners filed a motion for reconsideration asking the IBEQ to reverse its previous decision (issued in May 2024) approving the air compliance boundaries set by IDEQ in the PTC. Under applicable Idaho law, the reconsideration motion could not be filed until after the IBEQ released its final order with respect to the PTC. On June 27, 2025, the IBEQ issued its decision rejecting the reconsideration motion. In July 2025, the same petitioners filed a petition for judicial review in Idaho state court challenging the decisions of the IDEQ to issue the PTC and the of the IBEQ upholding the permit. The Company believes that the IDEQ and IBEQ properly followed Idaho law in issuing the PTC. However, there can be no assurance that the PTC will be upheld upon judicial review.
Item 1A. Risk Factors
In addition to other information set forth in this Quarterly Report on Form 10-Q, you should carefully consider the risk factors and other cautionary statements described under the heading “Risk Factors” included in our Annual Report on Form 10-K for the year ended December 31, 2024 which could materially affect our businesses, financial condition, or future results. Additional risks and uncertainties currently unknown to us, or that we currently deem to be immaterial, also may materially adversely affect our business, financial condition, or future results. Except as set forth below, there have been no material changes in our risk factors from those described in our Annual Report on Form 10-K for the year ended December 31, 2024.
Our largest shareholder has significant influence on us and may also affect the market price and liquidity of our securities.
Paulson holds in the aggregate 30.1% of the outstanding shares in Perpetua as of August 1, 2025. Accordingly, Paulson has significant influence in determining the outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, consolidations, and the sale of all or substantially all of our assets and other significant corporate actions. The concentration of ownership of the common shares by Paulson may: (i) delay or deter a change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their common shares as part of a sale of the Company; and (iii) affect the market price and liquidity of the common shares. Pursuant to the terms of the Investor Rights Agreement, Paulson has the right to designate two Board members so long as Paulson holds not less than 20% of our common shares and the right to designate one Board member so long as Paulson holds not less than 10% of our common shares. Marcelo Kim and Andrew Cole are Paulson’s nominees to the Board and Marcelo Kim was appointed Chairman of our Board in March of 2020.
As long as Paulson maintains its shareholdings in the Company, Paulson will have significant influence in determining the members of the Board. Without the consent of Paulson, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of Paulson may differ from or be adverse to the interests of our other shareholders. The effect of these rights and Paulson’s influence may impact the price that investors are willing to pay for our shares. If Paulson or its affiliates sell a substantial number of our common shares in the public market, the market price of the common shares could fall. The perception among the public that these sales will occur could also contribute to a decline in the market price of our common shares.
We do not currently have sufficient funds or committed financing necessary to commence construction of the Project, and we may be unable to raise the necessary funds. Financing that we enter into to fund the Project may subject us to restrictive covenants, significant debt service costs or otherwise affect the value of the Project.
We have commenced pre-construction engineering and other preparations with the goal of commencing construction of the Project in 2025. According to the Financial Update, as of December 31, 2024, the total initial capital cost estimate for the Project was approximately $2,215 million, excluding debt service and other financing costs. These costs are subject to change due to cost over-runs, delays in project financing or permitting timelines, litigation, or other unbudgeted events, such as effects of inflation, elevated interest rates and the potential impact of tariffs on U.S. trading partners. In addition, prior to commencing construction, the Company is obligated to secure reclamation bonds or other financial instruments to satisfy financial assurance requirements applicable under applicable federal and state law.
We do not currently have sufficient funds or committed financing to commence construction of the Project and our ability to obtain sufficient funds or committed financing on acceptable terms, or at all, may be impacted by various factors, including, but not limited to, market conditions or commodity pricing; unfavorable interest rates; regulatory uncertainty; the incurrence of additional debt, which may be subject to certain restrictive covenants; restrictions on our use of government funding and permitting delays or challenges to our existing permits. The cost and terms of such financing, if obtained, may significantly reduce the expected benefits from development of the Project and/or render such development uneconomic, including by imposing restrictive covenants; limiting our ability to control certain property or development decisions as a result of our entry into joint ventures or other similar arrangements; the loss of certain economic benefits of our property as a result of our entry into royalty or similar agreements; or dilution to existing shareholders resulting from additional equity financing.
28
Table of Contents
In addition to our application for debt financing from U.S. EXIM (See “— The issuance of a final financing commitment from U.S. EXIM is subject to U.S. EXIM’s underwriting criteria, authorization process, finalization and satisfaction of terms and conditions, and the amount and timing of such funding, if any, is uncertain and subject to conditions outside the Company’s control”), we are in advanced stages of discussions with potential partners who are able to guarantee the Company’s obligations to surety providers in connection with acquiring either a gold NSR royalty or a gold stream. If successful, we expect the guarantee and indemnification is anticipated to be sufficient to satisfy substantially all of the obligations of the Company to provide construction phase financial assurance to USFS, USACE, IDL and IDWR as required by regulatory authorizations from these agencies, including the USFS Record of Decision for the Project and IDL’s approval of the reclamation plan and permanent closure plan for the Project. However, the corresponding royalty or stream would reduce the revenues realized by the Company from mining operations at the Project, if constructed. The closing of the transaction is subject to successful negotiation of terms and satisfaction of customary closing conditions, including the completion of due diligence. There can be no assurance that we will realize the expected benefits of the transaction, including our ability to satisfy our financial assurance requirements under applicable federal and state law at expected rates and on anticipated timelines, if at all.
Our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, permitting, development, construction, or production at the Project. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
The issuance of a final financing commitment from U.S. EXIM is subject to U.S. EXIM’s underwriting criteria, authorization process, finalization and satisfaction of terms and conditions, and the amount and timing of such funding, if any, is uncertain and subject to conditions outside the Company’s control.
On April 8, 2024, the Company announced that it received a non-binding and conditional Letter of Interest (the “LOI”) from U.S. EXIM for potential debt financing of up to $1.8 billion through U.S. EXIM’s MMIA initiative and the CTEP. On May 23, 2025, the Company announced that it had submitted its formal application to U.S. EXIM for the potential debt financing of up to $2.0 billion. A funding commitment, if any, is conditional upon successfully completing the due diligence and underwriting process, which may not be completed on the expected timeline, or at all. If the Company’s application is approved, there can be no assurance that the U.S. EXIM financing will be for the full amount indicated in the LOI or the increased amount requested in the application, or that the approved U.S. EXIM financing will be sufficient for the Company to commence construction of the Project. Further, release of funding under any such commitment would be subject to the satisfaction of certain conditions and covenants by the Company. There can be no assurance that the Company will be able to successfully satisfy any or all of such conditions on the expected timeline, or at all, and the amount and timing of such funding, if any, is uncertain and subject to conditions outside the Company’s control.
The application review process is controlled by U.S. EXIM and is subject to the procedures, priorities and staffing of the agency. As a result, the Company’s application may not be reviewed or processed on the Company’s preferred or expected timeline, and funds may not be available when needed to commence construction. Furthermore, U.S. EXIM funding is subject to the priorities of the federal government, which may result in changes to the amount, timing or conditions of funding. Even if approved, the terms of any U.S. EXIM funding may not be on acceptable terms or may be subject to conditions that the Company is unable to satisfy. If the Company is unable to secure U.S. EXIM financing, it may be unsuccessful in obtaining other project financing when needed or to commence construction on the Project.
We require various permits to commence construction and operation of the Project and any future operations, and delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.
As of June 2025, we have received all federal permits needed to advance the Project towards a construction decision and have two principal state permitting programs and one state permit modification outstanding. In addition, our current and anticipated future operations, including further exploration and development activities and commencement of construction and operations on the Project, require additional authorizations from various United States state and local governmental authorities that have not yet been obtained, including providing financial assurance in favor of federal and state agencies to satisfy the requirements of applicable federal and state law. The regulatory approvals already issued by the IDL require, and the anticipated Notice to Proceed from the USFS is expected to require, that construction phase financial assurance (in the form of reclamation bonds or other financial instruments in the form acceptable to the relevant agencies) in the aggregate amount of approximately $155 million in favor of USFS, USACE, and other federal and state agencies be posted by the Company before Project construction starts. It is expected that additional financial assurance for Project operations will be required by the relevant agencies when the Company moves from the construction phase to the operations phase of the Project. There can be no assurance that such regulatory authorizations will be obtainable on reasonable terms, or at all. Furthermore, permitting requirements can be costly to comply with and involve extended timelines. Permitting delays, failure to obtain
29
Table of Contents
such permits, or a failure to comply with the terms of any United States federal, state or local permits that we have obtained or successful legal challenges to the issuance of permits we have obtained, could have a material adverse impact on us.
Although the Project was included on the FAST-41 list of priority projects, such inclusion may be reconsidered based on updated information and does not imply endorsement of or support for the Project by the federal government, or create a presumption that the Project will receive any required outstanding regulatory approvals or favorably reviewed by any agency, or receive federal funding.
The duration and success of efforts to obtain, maintain, and renew permits are contingent upon many variables not within our control. Shortage of qualified and experienced personnel in the various levels of government could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline of the various projects. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process, (ii) significant public response regarding the Project or any future projects the Company undertakes, and (iii) the initiation and disposition of legal proceedings challenging the Project or any regulatory approvals required for it. Additionally, to the extent that we are granted necessary permits, we will may be subject to a number of Project requirements or conditions, including, but not limited, to the installation or undertaking of programs to protect air and water quality and to safeguard protected species and their habitat, sites, or otherwise limit the impacts of our operations. Various permits will require the Company to provide bonding or other financial assurance to federal and state agencies to assure the Company complies with Project requirements, including requirements relating to reclamation of disturbances or impacts to the environment caused by the Project. Previously obtained permits may be suspended or revoked for a variety of reasons. While we strive to obtain and comply with all necessary permits and approvals, any failure to do so may have negative impacts upon our business or financial condition, such as increased delays, curtailment of our operations, increased costs, implementation of mitigation or remediation requirements, the potential for litigation or regulatory action, and damage to our reputation.
We have no history of commercially producing precious metals from our mineral properties and there can be no assurance that we will successfully establish mining operations or profitably produce precious metals.
The Project is not in production or currently under construction, and we have no ongoing mining operations or revenue from mining operations. Mineral exploration and development has a high degree of risk and few properties that are explored are ultimately developed into producing mines. The future development of the Project will require obtaining remaining state and local permits and financing and the construction and operation of mines, processing plants and related infrastructure, as well as ongoing compliance with and maintenance of federal, local and state permits. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises, including, among others:
● | The need to obtain and maintain environmental and other governmental approvals and permits, the timing and conditions of those approvals and permits, and challenges, including to litigation, to the issuance of such approvals and permits; |
● | The need to obtain and maintain financial assurance in favor of federal and state agencies required under applicable statutes, regulations, and permits first for the construction phase of the Project and subsequently for the operations phase of the Project; |
● | The potential that future exploration and development of mineral claims on or near the Project site may be impacted by litigation and/or consent decrees entered into by previous owners of mineral rights; |
● | The availability and cost of funds necessary to finance construction and development activities; |
● | The timing and cost, which can be considerable, of the construction of mining and processing facilities, as well as other related infrastructure; |
● | Potential opposition from Native American tribes, non-governmental organizations, environmental groups or local groups, which may delay or prevent permitting, development and construction activities; |
● | Potential increases in construction and operating costs due to changes in the cost of labor, fuel, power, materials and supplies, services, and foreign exchange rates; |
● | The availability and cost of skilled labor and mining equipment; and |
● | The availability and cost of appropriate smelting and/or refining arrangements |
30
Table of Contents
The costs, timing and complexities of mine construction and development are increased by the remote location of the Project, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. The lack of availability of such infrastructure on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay development of the Project. Cost estimates have in the past and may in the future increase significantly as more detailed engineering work and studies are completed. We do not have an operating history upon which we can base estimates of future operating costs; thus, actual capital costs, operating costs, production and economic returns may differ significantly from those we have anticipated and there are no assurances that any future development activities will result in profitable mining operations. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Furthermore, a significant drop in commodity prices over a sustained period of time could render the Project not economically viable or limit our ability to maintain operations. Accordingly, there are no assurances that our activities will result in profitable mining operations, that we will successfully establish mining operations, or that we will profitably produce precious metals at the Project.
In addition, there is no assurance that our mineral exploration activities will result in any discoveries of new ore bodies. If further mineralization is discovered, there is also no assurance that the commercial production of the mineralized material would be economical. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation, and environmental protection requirements.
Our operations, including permitting, currently are and in the future may be subject to legal challenges, which could result in adverse impacts to our business and financial condition.
Due to the nature of our business and our status as a publicly traded company, we may be subject to numerous regulatory investigations, claims, lawsuits and other proceedings, including proceedings related to claims brought pursuant to federal securities laws, in the ordinary course of our business. For example, in February 2025, a putative federal class action lawsuit was filed in the United States District Court for the District of Idaho against the Company and certain of its current officers and directors, on behalf of a proposed class of purchasers of the Company’s common shares during the period from April 17, 2024 to February 13, 2025. The Company believes that the claim is without merit and intends to vigorously defend itself. However, the results of these or other legal proceedings that may arise cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.
Our mining, exploration, and development operations, including Project construction and operations and the regulatory authorizations required for such activities, may be subject to legal challenges at the international, federal, state, and local level by various parties. Such legal challenges may allege non-compliance with laws and regulations or may seek to invalidate permits or regulatory actions regarding the Project or future projects undertaken by the Company. For example, on February 18, 2025, following the USFS’ publication of the Record of Decision and FEIS authorizing the mine plan for the Project, claims were filed in the U.S. District Court for the District of Idaho against the USFS and other federal agencies by a number of claimants, alleging violations of NEPA and other federal laws in the regulatory process and seeking to vacate key governmental permits and Project approvals and enjoin any further implementation of the Project. The court has granted PRII’s motion to intervene in this lawsuit. Other legal challenges in federal or state judicial or legal proceedings have been instituted , including an ongoing challenges to the Company’s air permit issued by IDEQ and Clean Water Act Section 401 water quality certification. While the Company believes the federal and state regulatory processes in respect of the Project have been conducted thoroughly and completely by the relevant regulatory agencies, there can be no assurance that the USFS Record of Decision, FEIS, and other Project approvals will be upheld upon administrative or judicial review or that such proceedings will be resolved in a timely manner.
Additionally, our Project is located in a mining district with significant impacts from legacy mining operations prior to our acquisition of legal interests in certain properties. Pursuant to CERCLA and other statutes, there is a risk that we may be subject to liability and remediation responsibilities with respect to these sites under applicable law, consent decrees or similar agreements. The Company is currently party to an Administrative Settlement and Order on Consent issued under CERCLA under which the Company agreed to voluntarily undertake response actions with respect to impacts from legacy mining operations, and also is subject to certain restrictions on the use of the Project mine site under certain consent decrees previously entered into by third parties and governmental authorities.
31
Table of Contents
Lawsuits and legal challenges to governmental permits and Project approvals, such as those described above and in our Annual Report on Form 10-K for the year ended December 31, 2024 and in this Quarterly Report on Form 10-Q, as well as legal proceedings or administrative challenges that may be brought in the future, may result in adverse impacts to our planned operations such as increased defense costs (to the extent we are a party to such challenges), the performance of additional mitigation and remedial activities, or significant delays to our Project or increases to the construction or operating costs of the Project. We may also be subject to more localized opposition, including efforts by environmental groups, which could attract negative publicity or have an adverse impact on our reputation.
A shortage of supplies and equipment, or the inability to obtain such supplies and equipment when needed and at expected prices, could adversely affect our ability to operate our business.
We are dependent on various supplies and equipment to carry out our current and future activities. The shortage of such supplies, equipment and parts, or the inability to obtain such supplies and equipment when needed, whether as a result of inflated costs, supply chain disruptions, trade tensions or restrictions or other reasons, could have a material adverse effect on our ability to carry out our activities and therefore have a material adverse effect on the cost of doing business.
General economic conditions may adversely affect the mining industry as a whole, as well as our growth, future profitability and ability to obtain sufficient financing.
Some key impacts which can contribute to financial market turmoil potentially impacting the mining industry include contraction in credit markets resulting in a widening of credit risk, imposition of trade tariffs among various countries, devaluations, high volatility in global equity, commodity, foreign exchange and precious metal markets and a lack of market liquidity. The prices of gold and gold mining company equities have experienced significant volatility over the past few years.
A decrease in the price of gold or tightening of credit in the financial markets or other economic conditions, including but not limited to, consumer spending, employment rates, business conditions, inflation, fuel and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates and tax rates, may adversely affect our ability to finance development and construction of the Project. Specifically:
● | global economic conditions could make other investment sectors more attractive, thereby affecting the cost and availability of financing to us and our ability to achieve our business plan; |
● | the imposition of protectionist or retaliatory trade tariffs by countries may impact our ability to import materials needed to construct our projects or conduct our operations, or to export our products, at prices that are economically feasible for our operations, or at all; |
● | the volatility of metal prices would impact the economic viability of the Project and any future revenues, profits, losses and cash flow; |
● | negative economic pressures could adversely impact demand for future production from the Project; |
● | construction related costs could increase and adversely affect the economics of the Project; |
● | volatile energy, commodity and consumables prices and currency exchange rates would impact our future production costs; and |
● | the devaluation and volatility of global stock markets would impact the valuation of our equity and other securities. |
32
Table of Contents
Changes in U.S. administrative policy, including the imposition of or increases in tariffs on steel and/or other raw materials, changes to existing trade agreements and any resulting changes in international trade relations, and changes in U.S. tax law may have an adverse effect on us.
The current international trade and regulatory environment is subject to significant ongoing uncertainty. The U.S. government has recently announced substantial new tariffs affecting a wide range of products and jurisdictions and has indicated an intention to continue developing new trade policies. For example, on July 31, 2025, the U.S. government announced new tariff rates for nearly 70 countries, including a 35% tariff on most Canadian goods exports that are non-compliant under the United States-Mexico-Canada Agreement. Certain foreign governments have announced or implemented retaliatory tariffs and other protectionist measures, and several tariff announcements have been followed by announcements of limited exemptions and temporary pauses. The ultimate impact of these tariffs is unknown at this time; however, these actions have caused uncertainty and volatility in financial markets that may broadly impact the terms or availability of credit or other financing. Similarly, declines in consumer confidence and/or consumer spending, changes in unemployment, significant inflationary or deflationary changes or disruptive regulatory or geopolitical events could contribute to increased volatility and diminished expectations for the economy and our markets and lead to demand or cost pressures that could negatively and adversely impact our business. Additionally, ongoing changes in U.S. and foreign government trade policies, including potential modifications to existing trade agreements and further restrictions on free trade, could introduce additional uncertainty. Any escalation of trade tensions, additional tariffs, retaliatory measures by foreign governments or shifts in U.S. or international trade policies could increase the cost and availability of the raw materials and equipment necessary for the exploration, development, and potential construction of the Project.
Additionally, tax laws, statutes, rules, or regulations could be enacted or amended at any time, which could affect our business or financial condition, including causing potentially adverse impacts to our effective tax rate, tax liabilities, and cash tax obligations. For example, the One Big Beautiful Bill Act (the “OBBBA”) was signed into law in July 2025. The OBBBA contains numerous tax provisions that we are currently in the process of evaluating, and which may affect our business or financial condition. In particular, the OBBBA phases out tax credits under Section 45X of the Internal Revenue Code for production and processing of certain critical minerals. Regulatory guidance under the OBBBA and other tax-related legislation is and continues to be forthcoming, and such guidance could ultimately increase or lessen the impact of these laws on our business and financial condition. In addition, it is uncertain if and to what extent various states will conform state tax laws to changes to federal tax legislation.
For as long as we are an “emerging growth company,” or a “smaller reporting company” we have not been required to comply with certain reporting requirements that apply to some other public companies. Once we no longer qualify as an emerging growth company and a smaller reporting company, our regulatory compliance costs and the demands placed upon our management are expected to increase.
Since we became a reporting issuer in the United States, we have been an “emerging growth company” and a “smaller reporting company” as defined under U.S. securities reporting rules and, as such, we were exempt from certain disclosure requirements applicable to other public companies that are not emerging growth companies or smaller reporting companies. Based on our market capitalization and public float as of June 30, 2025, we expect to lose our emerging growth company status and smaller reporting company status as of December 31, 2025. Therefore, once we lose our status as an emerging growth company and a smaller reporting company, we will no longer be able to take advantage of the reduced disclosure requirements currently available to us. Specifically, starting in 2026 we will be required to, among other things:
● | Have an auditor report on our internal control over financial reporting pursuant to Sarbanes-Oxley; |
● | Comply with any new or revised financial accounting standards without an extended transition period; |
● | Provide expanded disclosure in our SEC filings, including, among other things, providing three, rather than two, years of audited financial statements in annual reports; |
● | Include more detailed compensation discussion and analysis in our filings under the Exchange Act; and |
● | Hold a non-binding stockholder advisory vote on executive compensation and stockholder approval of any “golden parachute” payments not previously approved. |
33
Table of Contents
In connection with the expected loss of our emerging growth company and smaller reporting company status, we expect to incur significant expenses and devote substantial management effort toward ensuring compliance with expanded disclosure requirements and the requirements of Section 404 of the Sarbanes-Oxley Act. If an independent assessment of our internal controls detects material weaknesses, or if we are unable to assert that our internal controls over financial reporting are effective, investors may lose confidence in the accuracy and completeness of our financial reports, the market price of our common stock could be adversely affected, and we could become subject to litigation or investigations by Nasdaq, SEC or other regulatory authorities, which could require additional financial and management resources and could have a material adverse effect on our business, financial condition, and results of operations.
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds.
Recent Sales of Unregistered Securities; Issuer’s Purchases of Equity Securities
None.
Item 3. Defaults Upon Senior Securities.
None.
Item 4. Mine Safety Disclosures.
Pursuant to Section 1503(a) of the Dodd-Frank Act, issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States are required to disclose specified information about mine health and safety in their periodic reports. These reporting requirements are based on the safety and health requirements applicable to mines under the Federal Mine Safety and Health Act of 1977 (the “Mine Act”) which is administered by MSHA. During the six months ended June 30, 2025, the Company and its subsidiaries were not subject to regulation by MSHA under the Mine Act and thus no disclosure is required under Section 1503(a) of the Dodd-Frank Act.
Item 5. Other Information.
34
Table of Contents
Item 6. Exhibits.
Exhibit |
| Description |
3.1 | | Certificate of Incorporation of Perpetua Resources Corp. (incorporated by reference to Exhibit 4.1 of the Company’s Registration Statement on Form S-8 (File No. 333-255147) filed with the SEC on April 9, 2021). |
3.2 | | Notice of Articles and Articles filed under the Business Corporations Act (British Columbia) (incorporated by reference to Exhibit 4.2 of the Company’s Registration Statement on Form S-8 (File No. 333-255147) filed with the SEC on April 9, 2021). |
3.3 | | Certificate of Change of Name (incorporated by reference to Exhibit 4.3 of the Company’s Registration Statement on Form S-8 (File No. 333-255147) filed with the SEC on April 9, 2021). |
3.4 | | Amendment to Articles, dated May 25, 2022 (incorporated by reference to Exhibit 3.1 of the Company’s Current Report on Form 8-K, filed with the SEC on May 27, 2022). |
4.1 | | Description of Common Shares (incorporated by reference to Exhibit 4.1 of the Company’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2022, filed with the SEC on August 12, 2022). |
10.1 | | Subscription Agreement, between the Company and Paulson, dated June 10, 2025 (incorporated by reference to Exhibit 10.1 of the Company’s Current Report on Form 8-K, filed with the SEC on June 16, 2025). |
31.1 | | Certification of Chief Executive Officer pursuant to Section 302 of Sarbanes-Oxley Act of 2002 (Rule 13a-14 (a) and 15d-14 (a) of the Exchange Act). |
31.2 | | Certification of Chief Financial Officer pursuant to Section 302 of Sarbanes-Oxley Act of 2002 (Rule 13a-14 (a) and 15d-14 (a) of the Exchange Act). |
32.1 | | Certification of Chief Executive Officer pursuant to Section 1350 of Title 18 of the United States Code. |
32.2 | | Certification of Chief Financial Officer pursuant to Section 1350 of Title 18 of the United States Code. |
101.INS | | Inline XBRL Instance Document |
101.SCH | | Inline XBRL Taxonomy Extension Schema Document |
101.CAL | | Inline XBRL Taxonomy Extension Calculation Linkbase Document |
101.DEF | | Inline XBRL Taxonomy Extension Definition Linkbase Document |
101.LAB | | Inline XBRL Taxonomy Extension Label Linkbase Document |
101.PRE | | Inline XBRL Taxonomy Extension Presentation Linkbase Document |
104 | | Cover Page Interactive Data File (embedded within the Inline XBRL document) |
35
Table of Contents
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Date: August 13, 2025 | PERPETUA RESOURCES CORP. | |
| | |
By: | /s/ Jonathan Cherry | |
Name: | Jonathan Cherry | |
Title: | President, Chief Executive Officer and Director |
36
Source: