Carolina Rush (PUCCF) has filed its maiden NI 43-101 Technical Report for the Brewer Gold-Copper Project in South Carolina. The report outlines significant mineral resources: Indicated resources of 6,022,000 tonnes grading 1.04 g/t gold and 1,266 ppm copper, containing 202,000 oz gold and 16.8M lbs copper. Inferred resources total 7,805,000 tonnes at 0.84 g/t gold and 460 ppm copper, containing 210,000 oz gold and 7.9M lbs copper. Additionally, the project includes backfill resources of 11.9M tonnes at 0.36 g/t gold and 345 ppm copper, containing 139,000 oz gold and 9.05M lbs copper. The project is strategically located 13km from the producing Haile Gold Mine.
Carolina Rush (PUCCF) ha presentato il suo primo Rapporto Tecnico NI 43-101 per il Progetto Oro-Rame Brewer in South Carolina. Il rapporto evidenzia risorse minerarie significative: risorse indicate di 6.022.000 tonnellate con una gradazione di 1,04 g/t oro e 1.266 ppm rame, contenenti 202.000 oz di oro e 16,8 milioni di libbre di rame. Le risorse inferite ammontano a 7.805.000 tonnellate con 0,84 g/t oro e 460 ppm rame, contenenti 210.000 oz di oro e 7,9 milioni di libbre di rame. Inoltre, il progetto include risorse di riempimento di 11,9 milioni di tonnellate a 0,36 g/t oro e 345 ppm rame, contenenti 139.000 oz di oro e 9,05 milioni di libbre di rame. Il progetto 猫 strategicamente situato a 13 km dalla miniera in produzione Haile Gold Mine.
Carolina Rush (PUCCF) ha presentado su primer Informe T茅cnico NI 43-101 para el Proyecto de Oro y Cobre Brewer en Carolina del Sur. El informe detalla recursos minerales significativos: recursos indicados de 6.022.000 toneladas con una ley de 1,04 g/t de oro y 1.266 ppm de cobre, conteniendo 202.000 oz de oro y 16,8 millones de libras de cobre. Los recursos inferidos suman 7.805.000 toneladas con 0,84 g/t de oro y 460 ppm de cobre, conteniendo 210.000 oz de oro y 7,9 millones de libras de cobre. Adem谩s, el proyecto incluye recursos de relleno de 11,9 millones de toneladas con 0,36 g/t de oro y 345 ppm de cobre, conteniendo 139.000 oz de oro y 9,05 millones de libras de cobre. El proyecto est谩 estrat茅gicamente ubicado a 13 km de la mina en producci贸n Haile Gold Mine.
Carolina Rush (PUCCF)電� 靷毎鞀れ簮搿る澕鞚措倶鞐� 鞙勳箻頃� Brewer 旮�-甑Μ 頂勲鞝濏姼鞐� 雽頃� 觳� 氩堨Ц NI 43-101 旮办垹 氤搓碃靹滊ゼ 鞝滌稖頄堨姷雼堧嫟. 氤搓碃靹滌棎電� 雼れ潓瓿� 臧欖潃 欤检殧 甏戨 鞛愳洂鞚� 氇呾嫓霅橃柎 鞛堨姷雼堧嫟: 6,022,000韱れ潣 響滌嫓 鞛愳洂鞚 旮� 1.04 g/t, 甑Μ 1,266 ppm 霌标笁鞙茧 202,000 鞓姢鞚� 旮堦臣 1,680毵� 韺岇毚霌滌潣 甑Μ毳� 韽暔頃╇媹雼�. 於旍爼 鞛愳洂鞚 齑� 7,805,000韱�鞙茧 旮� 0.84 g/t, 甑Μ 460 ppm 霌标笁鞚措┌ 210,000 鞓姢鞚� 旮堦臣 790毵� 韺岇毚霌滌潣 甑Μ毳� 韽暔頃╇媹雼�. 於旉皜搿�, 頂勲鞝濏姼鞐愲姅 旮� 0.36 g/t, 甑Μ 345 ppm 霌标笁鞚� 11.9氚彪 韱れ潣 霅橂⿺鞖瓣赴 鞛愳洂鞚� 韽暔霅橃柎 鞛堨溂氅�, 139,000 鞓姢鞚� 旮堦臣 905毵� 韺岇毚霌滌潣 甑Μ毳� 韽暔頃╇媹雼�. 鞚� 頂勲鞝濏姼電� 靸濎偘 欷戩澑 Haile 旮堦磻鞐愳劀 13km 霒柎歆� 鞝勲灥鞝� 鞙勳箻鞐� 鞛堨姷雼堧嫟.
Carolina Rush (PUCCF) a d茅pos茅 son premier Rapport Technique NI 43-101 pour le Projet Or-Cuivre Brewer en Caroline du Sud. Le rapport met en avant des ressources min茅rales significatives : ressources indiqu茅es de 6 022 000 tonnes avec une teneur de 1,04 g/t en or et 1 266 ppm en cuivre, contenant 202 000 oz d'or et 16,8 millions de livres de cuivre. Les ressources inf茅r茅es totalisent 7 805 000 tonnes 脿 0,84 g/t en or et 460 ppm en cuivre, contenant 210 000 oz d'or et 7,9 millions de livres de cuivre. De plus, le projet comprend des ressources de remblai de 11,9 millions de tonnes 脿 0,36 g/t en or et 345 ppm en cuivre, contenant 139 000 oz d'or et 9,05 millions de livres de cuivre. Le projet est strat茅giquement situ茅 脿 13 km de la mine d'or en production Haile Gold Mine.
Carolina Rush (PUCCF) hat seinen ersten NI 43-101 Technischen Bericht f眉r das Brewer Gold-Kupfer Projekt in South Carolina eingereicht. Der Bericht beschreibt bedeutende Mineralressourcen: angezeigte Ressourcen von 6.022.000 Tonnen mit einem Gehalt von 1,04 g/t Gold und 1.266 ppm Kupfer, die 202.000 Unzen Gold und 16,8 Millionen Pfund Kupfer enthalten. Die abgeleiteten Ressourcen betragen insgesamt 7.805.000 Tonnen mit 0,84 g/t Gold und 460 ppm Kupfer, die 210.000 Unzen Gold und 7,9 Millionen Pfund Kupfer enthalten. Zus盲tzlich umfasst das Projekt R眉ckf眉llressourcen von 11,9 Millionen Tonnen mit 0,36 g/t Gold und 345 ppm Kupfer, die 139.000 Unzen Gold und 9,05 Millionen Pfund Kupfer enthalten. Das Projekt liegt strategisch 13 km von der produzierenden Haile Gold Mine entfernt.
Positive
  • Significant maiden resource estimate with 202,000 oz gold and 16.8M lbs copper in Indicated category
  • Additional 210,000 oz gold and 7.9M lbs copper in Inferred category
  • Strategic location near producing Haile Gold Mine
  • Potential additional resources from backfill material containing 139,000 oz gold and 9.05M lbs copper
Negative
  • Resources are not mineral reserves and lack demonstrated economic viability
  • Backfill resources require additional studies and metallurgical testing
  • Inferred resources have lower confidence level and require further exploration
  • Project may face environmental, permitting, and legal challenges

Toronto, Ontario--(Newsfile Corp. - May 2, 2025) -  Carolina Rush Corporation (TSXV: RUSH) (OTCQB: PUCCF) ("Carolina Rush," "Rush" or the "Company") announced that it has filed an independent technical report (the "Technical Report") prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-10") in respect to the maiden mineral resource estimate for the Company's Brewer Gold-Copper deposit ("Brewer deposit"), located in Chesterfield County, South Carolina.

The Technical Report, titled "NI 43-101 Technical Report and Mineral Resource Estimate, Brewer Gold-Copper Project, Jefferson, South Carolina, USA", with an effective date of March 20, 2025, and an issue date of May 2, 205, was prepared under National Instrument 43-101 ("NI 43-101") standards by Qualified Persons (QP), Patrick O. Quigley and Patrick J. Hollenbeck.

The Brewer Gold-Copper Project is located at the past-producing, 397-hectare Brewer Gold Mine property in Chesterfield County, South Carolina, 13 kilometers along trend from the producing Haile Gold Mine (). The proximity of the Brewer Gold-Copper Project to the Haile Gold Mine does not imply that mineralization or results from Haile are indicative of mineralization at Brewer.

Table 1: Brewer in Situ Mineral Resource Statement (0.5 g/t Au cutoff):



Average ValueMaterial Content
I&IMassAuCuAu Cu

thousand tonnesg/tppmthousand ozthousand lbs.
Indicated6,0221.041,26620216,811
Inferred7,8050.844602107,908
 Differences may occur in totals due to rounding.  

 

(1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.

(2) The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

(3) The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration.

(4) The Mineral Resources in this report were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council.

(5) A NI 43-101 Technical Report supporting the Maiden Mineral Resource Estimate is filed on SEDAR+ at . Investors are encouraged to review the full report, which will provide further details on key assumptions, parameters, and risks associated with the Mineral Resource Estimate.

Table 2: Brewer Inferred Backfill Mineral Resource Statement:



Average ValueMaterial Content
Backfill ModelMassAuCuAuCu

thousand tonnesg/tppmthousand ozthousand lbs.
HLP 1-42,0000.179411414
HLP 51,5790.49863253,007
HLP 62,4290.22292171,561
Waste Rock5,1590.49343803,897
B6 (Waste Rock)7330.261056171
Total11,9000.363451399,050
Differences may occur in totals due to rounding.

 

(1) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.

(2) The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

(3) The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve.

(4) The Mineral Resources in this report were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council.

(5) Details on the metallurgical properties and processing methods required to extract gold and copper from the backfill material have not been undertaken. As such, the Backfill resource is considered theoretical and additional studies are required to report the inferred resources at a higher level of confidence. No cutoff grade was applied to the backfill mineral resource.

(6) A NI 43-101 Technical Report supporting the Maiden Mineral Resource Estimate is filed on SEDAR+ at . Investors are encouraged to review the full report, which will provide further details on key assumptions, parameters, and risks associated with the Mineral Resource Estimate.

Qualified Person

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in NI 43-101 and reviewed and approved by Patrick Quigley, MSc, CPG-12116, the Company's Senior Geologist and Exploration Manager and a Qualified Person as defined by NI 43-101.

About Carolina Rush

Carolina Rush Corporation (TSXV: RUSH) (OTCQB: PUCCF) is a U.S.-focused exploration company 100% committed to advancing the Brewer Gold-Copper Project in South Carolina-a large, underexplored system with the potential to host both near-surface epithermal and deep porphyry-style mineralization. Located just 13 km from OceanaGold's producing Haile Gold Mine, Brewer is a past-producing operation now under modern exploration.

A maiden NI 43-101 mineral resource estimate with an effective date of May 2, 2025, outlines 202,000 ounces of gold in the indicated category (6.0 Mt @ 1.04 g/t Au) plus another 210,000 ounces of gold in the inferred category (7.8 Mt @ 0.84 g/t Au), with significant expansion potential in multiple directions. In addition, a resource estimate of the backfill material contained in the former open pit estimates 139,000 ounces of gold in the inferred category (11.9 Mt @ 0.36 g/t Au). Supported by a seasoned technical team, established infrastructure, and strong community relationships, Carolina Rush is aggressively advancing Brewer's near-surface epithermal and deep porphyry potential.

For further information, please contact:

Layton Croft, President and CEO
or
Jeanny So, Corporate Communications Manager
E: [email protected]
T: +1.647.202.0994

For additional information please visit our new website at and our X feed: .

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. This news release contains forward-looking information pertaining to the Company's 2025 Maiden MRE; that the mineral resource remains open at depth, the potential for future MRE growth from deeper drilling, and/or future exploration. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, and other risks involved in the mineral exploration and development industry, including those risks set out in the Company's management's discussion and analysis as filed under the Company's profile at . Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including that all necessary governmental and regulatory approvals will be received as and when expected. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

To view the source version of this press release, please visit

FAQ

What is the total gold resource reported in Carolina Rush's (PUCCF) Brewer Project?

The total gold resource includes 202,000 oz in Indicated category, 210,000 oz in Inferred category, and 139,000 oz in backfill material, totaling 551,000 oz of gold.

What are the copper resources at Carolina Rush's Brewer Project?

The copper resources include 16.8M lbs in Indicated category, 7.9M lbs in Inferred category, and 9.05M lbs in backfill material, totaling approximately 33.75M lbs of copper.

Where is Carolina Rush's (PUCCF) Brewer Gold-Copper Project located?

The Brewer Gold-Copper Project is located in Chesterfield County, South Carolina, 13 kilometers from the producing Haile Gold Mine.

What is the grade of the Indicated resource at Carolina Rush's Brewer Project?

The Indicated resource grades 1.04 g/t gold and 1,266 ppm copper.

What are the main challenges for Carolina Rush's Brewer Project resource?

The main challenges include proving economic viability, conducting additional studies for backfill material, and addressing potential environmental, permitting, and legal issues.
Carolina Rush Corporation

OTC:PUCCF

PUCCF Rankings

PUCCF Latest News

PUCCF Stock Data

3.30M
52.84M
10.44%
8.44%
Gold
Basic Materials
Canada
Toronto